Overview

The decommissioning of offshore oil and gas installations and pipelines on the United Kingdom Continental Shelf (UKCS) is controlled through the Petroleum Act 1998.

The responsibility for ensuring that the requirements of the Petroleum Act 1998 are complied with rests with the Offshore Petroleum Regulator for Environment and Decommissioning (OPRED) which sits within the Department for Business, Energy and Industrial Strategy.

Owners of oil and gas installations and pipelines are required to decommission their offshore infrastructure at the end of a field’s economic life and the 1998 Act requires owners to set out the measures to decommission disused installations and/or pipelines in a decommissioning programme.

A decommissioning programme must identify all the items of equipment, infrastructure and materials that have been installed or drilled and describe the decommissioning solution for each.

OPRED aims to be transparent in its consideration of decommissioning programmes. As a result members of the public, other organisations, non-governmental organisations and other government departments or agencies are invited to comment on the proposals set out in a programme.

Details of the current programmes under consideration are noted in the table below.

OPRED provides guidance on the regulatory requirements for decommissioning. Final guidance on the Environmental Considerations for Decommissioning (Section 12) has now been incorporated into the guidance notes Offshore Oil and Gas Decommissioning Guidance Notes November 2018 (PDF, 1.27 MB, 138 pages). Please see Updates to Offshore Oil and Gas Decommissioning Guidance

Financial Assurance Guidance for the Decommissioning of Offshore Oil and Gas Installations and Pipelines. Financial Assurance Guidance (PDF, 278 KB, 17 pages)

The guidance outlines how the government assesses the financial capability of persons with a relevant interest in or considering taking an interest in an offshore oil or gas field. For the purposes of satisfying the Secretary of State that that person will be capable of carrying out a decommissioning programme in relation to that interest.

It explains our financial assurance policy and existing processes setting out the steps taken to assess the financial health of offshore oil and gas companies with an interest or potential interest in a field, outlining how and when we may use the statutory powers set out in the Petroleum Act 1998.

If you have any comments or questions relevant to the guidance, please email us at odu@energysecurity.gov.uk.

Proposed changes to charging a fee in respect of decommissioning offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 as amended by the Energy Act 2008

The aim of this consultation was to formally seek views from stakeholders such as offshore oil and gas operators, companies with an interest in decommissioning offshore oil and gas installations and pipelines, and other interested parties, on the proposal to update the charging regime for activity related to the regulatory functions for the decommissioning of offshore oil and gas installations. Fees consultation document - May 2021 (PDF, 224 KB, 19 pages) Offshore oil and gas cost recovery consultation impact assessment (PDF, 247 KB, 11 pages) Response to consultation document - April 2022 (PDF, 189 KB, 12 pages)

If you have any questions regarding the proposed changes please direct these to odu@energysecurity.gov.uk.

Draft decommissioning programmes under consideration

Decommissioning Programme Operator Main Points of DP Documents
Durango Subsea Installation Perenco North Sea Limited Wellhead protection structure will be recovered to shore for either re-use, recycling, or disposal. Durango Decommissioning Programme (PDF, 938 KB, 33 pages) Durango Environmental Appraisal (PDF, 3.85 MB, 88 pages)
Guinevere Pipelines Perenco Gas (UK) Limited Partial removal of pipelines and remaining section of buried/trenched pipelines to remain in situ. Guinevere Pipelines DP (PDF, 1.87 MB, 39 pages) Guinevere Pipelines CA (PDF, 2.71 MB, 62 pages) Guinevere Pipelines EA (PDF, 4.39 MB, 102 pages)
Garrow Energean UK Ltd Small steel platform and surface laid sections of pipelines will be recovered to shore for re-use or recycling. Protection/stabilisation features will be recovered to shore. Buried section of pipelines and stabilisation features to be left in situ. Garrow DP (PDF, 5.16 MB, 47 pages) Garrow CA (PDF, 2.88 MB, 36 pages) Garrow EA (PDF, 8.05 MB, 103 pages)
Thistle Upper Jacket EnQuest Heather Limited The upper jacket and pipeline risers will be cut between 65 m and 75 m below LAT and recovered to shore. Thistle Upper Jacket DP (PDF, 3.53 MB, 46 pages)
Eider Upper Jacket TAQA Bratani Limited The Eider Upper Jacket and pipeline risers will be cut to a depth of approximately 127m below lowest astronomical tide and recovered to shore for recycling or disposal. Eider Upper Jacket DP (PDF, 3.47 MB, 44 pages) Eider Upper Jacket EA (PDF, 3.22 MB, 93 pages)
East Brae Upper Jacket TAQA Bratani Limited The East Brae Upper Jacket and pipeline risers will be cut to a depth of approximately 97m below lowest astronomical tide and recovered to shore for recycling or disposal. East Brae Upper Jacket DP (PDF, 1.71 MB, 38 pages)
Beauly Repsol Sinopec Resources UK Limited The wellhead and WHPS will be recovered to shore. The trenched and buried pipelines and umbilicals will be decommissioned in situ. The exposed sections will be either trenched and buried or covered with rock. All surface laid spools/jumpers will be recovered to shore. Beauly DP (PDF, 4.89 MB, 40 pages) Beauly & Burghley CA (PDF, 11.5 MB, 73 pages) Beauly & Burghley EA (PDF, 12.6 MB, 97 pages)
Burghley Repsol Sinopec Resources UK Limited The valve skid, wellhead and WHPS will be recovered to shore. The trenched and buried pipelines and umbilicals will be decommissioned in situ. The exposed sections will be either trenched and buied or covered with rock. All surface laid spools/jumpers will be recovered to shore. Burghley DP (PDF, 5.16 MB, 42 pages) Beauly & Burghley CA (PDF, 11.5 MB, 73 pages) Beauly & Burghley EA (PDF, 12.6 MB, 97 pages)
Dunlin Alpha Fairfield Betula Limited Decommissioning in situ of Dunlin Alpha concrete gravity based structure and storage cells. Dunlin Alpha Decommissioning Programme (PDF, 6.5 MB, 77 pages) Dunlin Alpha Decommissioning Comparative Assessment Report (PDF, 3.66 MB, 133 pages) Dunlin Alpha Decommissioning Environmental Appraisal (PDF, 6.58 MB, 176 pages)
Brae Alpha, Brae Bravo, Central Brae, West Brae and Sedgwick Marathon Oil UK LLC Removal of Brae Alpha and Brae Bravo jackets to the top of the footings. Removal of Central Brae, West Brae and Sedgwick subsea installations. Pipelines to be decommissioned in a variety of ways including removal, trenching and leave in situ. Brae Alpha, Brae Bravo, Central Brae, West Brae and Sedgwick Decommissioning Programmes (PDF, 15.3 MB, 120 pages) Brae A etc, Environmental Statement – Main Report (PDF, 14.6 MB, 80 pages) Brae A etc. Environmental Statement - Technical Appendices (PDF, 13.3 MB, 96 pages) Brae A Substructure Comparative Assessment (PDF, 1.7 MB, 30 pages) Brae B Substructure Comparative Assessment (PDF, 1.59 MB, 30 pages) Brae Area Subsea Assets Comparative Assessment (PDF, 6.84 MB, 43 pages)
Brent Shell U.K. Limited Decommissioning in situ of Brent Bravo, Charlie and Delta concrete gravity based structures. Brent Decommissioning Programme (PDF, 12 MB, 322 pages) Brent ES (PDF, 12.5 MB, 475 pages) Brent EIA (PDF, 5.05 MB, 429 pages) Brent ES Appendix (PDF, 2.52 MB, 45 pages) A suite of detailed Technical Documents which support the Decommissioning Programmes documents are available on the Shell Website
Atlantic and Cromarty BG Global Energy Limited and Hess Limited Manifold and WHPS to be removed for recycling/disposal. Partial removal of pipelines and remaining section of buried/trenched pipelines to remain in situ. Atlantic & Cromarty Decommissioning Programmes (PDF, 1.76 MB, 50 pages) Atlantic & Cromarty Stakeholder Report (PDF, 1.11 MB, 32 pages) Atlantic & Cromarty Environmental Impact Assessment (PDF, 4.5 MB, 109 pages) Atlantic & Cromarty Comparative Assessment (PDF, 2.06 MB, 110 pages)

Approved decommissioning programmes

Decommissioning Programme and Approval Date Operator at approval Operator following licence / company change RevisionApproved DetailsDecommissioning andsolutionYear Approvalof DateApproval Close out reportYear andclose Dateout Accepted report accepted
KGP Final DP (PDF, 2.49 MB, 56 pages) KGP Final CA (PDF, 1.83 MB, 48 pages) KGP Final EA (PDF, 3.12 MB, 74 pages) May 2024 Gassco AS -          - -          Decommissioning in situ of Knarr Gas Pipeline in UKCS sector. -          May 2024   
Rochelle WHPS and Jumper DPs (PDF, 2.87 MB, 41 pages) May 2024 CNOOC Petroleum Europe Limited -          - -          Wellhead Protection Structures and associated tie-in spools and jumpers will be recovered to shore for reuse, recycling or disposal. -          May 2024   
Leman 27H + 27J Topsides DP (PDF, 3.36 MB, 80 pages) April 2024 Perenco UK Limited -          - -          Topsides will be recovered to shore for either re-use, recycling or disposal. -          April 2024   
Trees Protection Cages (Birch, Larch and Sycamore) DP (PDF, 2.59 MB, 38 pages) February 2024 Spirit Energy North Sea Oil Limited -          - -          Removal of Protection cages to shore for recycling -          February 2024   
Leman F & G DP (PDF, 9.92 MB, 86 pages) Leman F & G CA (PDF, 9.5 MB, 63 pages) Leman F & G EA (PDF, 15.1 MB, 165 pages) January 2024 Shell U.K. Limited -          N/A -          Removal of topsides and jackets to shore for recycling/disposal. Trenched and buried pipelines to remain in situ; exposed ends removed. -          January 2024   
Helvellyn CA (PDF, 9.84 MB, 46 pages) Helvellyn EA (PDF, 7.37 MB, 101 pages) Helvellyn DP (PDF, 4.75 MB, 44 pages) January 2024 Waldorf Petroleum Resources Limited -          N/A -          Subsea installation, surface laid pipeline and umbilical will be recovered to shore for re-use or recycling. Protection/stabilisation features will be recovered to shore. Buried section of pipeline and umbilical to be left in situ. -          January 2024   
Western Isles Subsea Final DP (PDF, 9.34 MB, 75 pages) Western Isles Subsea EA Final (PDF, 7.1 MB, 141 pages) Western Isles Subsea CA Final (PDF, 5.49 MB, 74 pages) October 2023 Dana Petroleum (E&P) Limited -          N/A -          Subsea installations and structures, surface laid pipelines and umbilicals to  be recovered to shore for re-use or recycling. Buried pipelines to be left in situ. Protection/stabilisation features will be recovered to shore. -          October 2023   
Devenick (PDF, 2.24 MB, 54 pages) Devenick CA (PDF, 2.02 MB, 58 pages) Devenick EA (PDF, 6.14 MB, 127 pages) October 2023 Taqa Bratani Limited -          N/A -          Installations,structures, and surface laid pipelines and umbilicals will be recovered to shore for re-use, recycling, or disposal. Surface laid portions of pipelines and umbilicals in close proximity to the East Brae jacket footings, and trenched and buried pipelines and umbilicals may be left in-situ. -          October 2023   
Western Isles FPSO DP (PDF, 5.78 MB, 65 pages) September 2023 Dana Petroleum (E&P) Limited -          - -          Full removal of the FPSO, flexible risers, dynamic umbilicals and the upper sections of the mooring lines -          September 2023   
Heather Pipelines DP (PDF, 4.22 MB, 56 pages) Heather Pipelines CA (PDF, 5.35 MB, 72 pages) Heather Pipelines EA (PDF, 6.78 MB, 117 pages) September 2023 EnQuest Heather Limited -          N/A -          Pipelines to remain in situ with surface laid sections recovered with pipeline ends buried. Riser sections between -75/-85m LAT will be recovered. Exposed protection/stabilisation features will be recovered. Materials will be recovered to shore for reuse, recycling or disposal.Existing rock will remain in situ. -          September 2023   
PLU6294 DP (PDF, 1.08 MB, 37 pages) September 2023 Shell U.K. Limited -          N/A -          Surface laid sections will be recovered to shore. The main section of the umbilical is trenched and buried and will remain in situ. Associated concrete mattresses will be recovered to shore. -          September 2023   
Chestnut Phase 2 DP (PDF, 5.6 MB, 57 pages) Chestnut Phase 2 EA (PDF, 7.97 MB, 104 pages) Chestnut Phase 2 CA (PDF, 4.42 MB, 67 pages) June 2023 Spirit Energy North Sea Oil Limited -          N/A -          All subsea installations, structures, surface laid pipelines and umbilicals, protection and stabilisation features will be recovered to shore for re-use or recycling. Buried pipelines to be left in situ. All wells will be decommissioned. -          June 2023   
Heather Upper Jacket DP (PDF, 3.24 MB, 41 pages) March 2023 EnQuest Heather Limited -          - -          The upper jacket and pipeline risers will be cut between 74m and 84m LAT and recovered to shore for recycling or disposal. -          March 2023   
Saltire A Topsides and Saltire Area Subsea Infrastructure DPs (PDF, 7.37 MB, 69 pages) Saltire EA (PDF, 7.09 MB, 109 pages) Saltire CA (PDF, 4.61 MB, 111 pages) December 2022 Repsol Sinopec Resources UK Limited -          - -          The topsides will be recovered for reuse, recycling or disposal. Subsea installations will be returned to shore for reuse, recycling or disposal. Bundles will be left in situ. Trenched and buried power cables and umbilicals will be left in situ with exposed sections being trenched and buried. Spools and transition sections shall be recovered to shore for reuse, recycling and disposal. -          December 2022   
Causeway & Fionn DP (PDF, 4.56 MB, 64 pages) Causeway & Fionn EA (PDF, 6.78 MB, 94 pages) Causeway & Fionn CA (PDF, 2.03 MB, 41 pages) December 2022 Ithaca Energy (UK) Limited -          - -          All Causeway and Fionn Subsea Installations and exposed tie-in spools will be removed and transported to shore for re-use or recycling. Pipelines and umbilicals will remain in situ with cut ends being buried. All wells will be plugged and abandoned. -          December 2022   
Johnston DP (PDF, 2.18 MB, 43 pages) Johnston EA (PDF, 5.25 MB, 121 pages) Johnston CA (PDF, 1.64 MB, 62 pages) December 2022 Premier Oil E&P UK EU Limited -          - -          Subsea installations will be recovered to shore for recycling and disposal. Trenched and buried rigid flowlines will be left in situ with exposed ends remediated with rock. Trenched and buried flexible flowlines, umbilicals, spool pieces and jumpers will be removed. -          December 2022   
Duart DP (PDF, 11.2 MB, 55 pages) Tartan Subsea EA (PDF, 36.4 MB, 137 pages) Tartan Subsea CA (PDF, 5.5 MB, 135 pages) November 2022 Repsol Sinopec Resources UK Limited -          - -          Subsea installations will recovered to shore. Trenched and buried pipelines and umbilicals will be left in situ, with remediation of any exposed sections -          November 2022   
Tartan N Terrace (TNT) & Tartan Satellite (TS) Subsea DPs (PDF, 4.07 MB, 72 pages) Tartan Subsea EA (PDF, 36.4 MB, 137 pages) Tartan Subsea CA (PDF, 5.5 MB, 135 pages) November 2022 Repsol Sinopec Resources UK Limited -          - -          Subsea installations and exposed surface laid lines will be recovered to shore. Piles will be cut to -3m below the seabed. Trenched and buried lines, and lines in open trenches but not adequately buried will be left in situ, with remediation of any exposed sections. -          November 2022   
Tartan Topsides DP (PDF, 8.28 MB, 46 pages) Tartan Subsea EA (PDF, 36.4 MB, 137 pages) November 2022 Repsol Sinopec Resources UK Limited -          - -          Topsides will be recovered to shore -          November 2022   
Lancaster Field Floating Production Storage and Offloading Vessel (FPSO) Decommissioning Programme (PDF, 2.51 MB, 37 pages) November 2022 Hurricane Energy PLC -          - -          The Floating Production Storage and Offloading Vessel (FPSO) will be removed to shore for either re-use or recycling. -          November 2022   
Hewett Area Subsea Installations DP (PDF, 4.45 MB, 54 pages) Hewett Area Subsea Installations EA (PDF, 14.8 MB, 150 pages) November 2022 Eni UK Limited -          - -          Subsea installations will be fully removed and recovered to shore for reuse, recycling or disposal. -          November 2022   
Scoter and Merganser DP (PDF, 4.63 MB, 92 pages) Scoter and Merganser CA (PDF, 1.94 MB, 47 pages) Scoter and Merganser EA (PDF, 6.4 MB, 130 pages) September 2022 Shell UK Limited -          - -          Subsea installations will be recovered to shore along with surface laid spools and jumpers. Buried pipelines will be left in situ. -          September 2022   
Sean DP (PDF, 5.05 MB, 64 pages) Sean CA (PDF, 2.8 MB, 110 pages) Sean EA (PDF, 9.44 MB, 171 pages) August 2022 ONE-Dyas UK Limited -          - -          Removal of 3 small platforms. Removal of pipeline SSIV and mooring buoys. Export pipelines to remain in situ. Cables and umbilicals returned to shore. -          August 2022   
Caister CDP1b (PDF, 5.96 MB, 56 pages) CMS Area EA (PDF, 10.4 MB, 171 pages) CMS Area CA (PDF, 13.5 MB, 145 pages) July 2022 Chrysaor Production (U.K.) Limited -          - -          Buried pipelines will be left in situ and surface laid pipelines will be removed to shore. -          July 2022   
Caister-Murdoch System CDP2 (PDF, 15.7 MB, 131 pages) CMS Area EA (PDF, 10.4 MB, 171 pages) CMS Area CA (PDF, 13.5 MB, 145 pages) July 2022 Chrysaor Production (U.K.) Limited -          - -          Topsides and jackets will be recovered to shore. Buried pipelines will be left in situ and surface laid pipelines will be recovered. -          July 2022   
Murdoch CDP3 (PDF, 8.53 MB, 83 pages) CMS Area EA (PDF, 10.4 MB, 171 pages) CMS Area CA (PDF, 13.5 MB, 145 pages) July 2022 Chrysaor Production (U.K.) Limited -          - -          Topsides and jackets will be recovered to shore. Buried pipelines will be left in situ and surface laid pipelines will be recovered. -          July 2022   
Brae Bravo Upper Jacket Decommissioning Programme (PDF, 1.76 MB, 41 pages) June 2022 TAQA Bratani Limited -          - -          The upper jacket and pipeline risers will be removed to 61m below LAT and recovered to shore for recycling or disposal. -          June 2022   
LOGGS Saturn Satellites LDP2 (PDF, 20 MB, 90 pages) LOGGS LDP2 - LDP5 Comparative Assessment (PDF, 3.21 MB, 203 pages) LOGGS LDP2 - LDP5 EA (PDF, 7.5 MB, 181 pages) June 2022 Chrysaor Production (U.K.) Limited -          - -          Topsides and jackets will be recovered to shore. Buried pipelines will be left in situ and the riser sections of pipelines will be removed to shore. -          May 2022   
Foinaven FPSO Offstation DP (PDF, 3.76 MB, 60 pages) May 2022 Britoil Limited -          - -          FPSO and mooring lines removed to shore for re-use or recycling. associated risers and umbilicals removed to shore for recycling. -          May 2022   
LOGGS V-Fields LDP4 (PDF, 20.8 MB, 83 pages) LOGGS LDP2 - LDP5 Comparative Assessment (PDF, 3.21 MB, 203 pages) LOGGS LDP2 - LDP5 EA (PDF, 7.5 MB, 181 pages) April 2022 Chrysaor Production (U.K.) Limited -          - -          Topsides and jackets will be recovered to shore. Buried pipelines will be left in situ. -          April 2022        
Hummingbird Spirit FPSO Sail away and Chestnut Riser Disconnection (PDF, 2.96 MB, 47 pages) March 2022 Spirit Energy North Sea Oil Limited -          - -          FPSO, mooring suction anchors and risers Removal to shore for either re-use or recycling -          March 2022         
Victoria DP (PDF, 2.54 MB, 42 pages) Victoria CA (PDF, 1.81 MB, 48 pages) Victoria EA (PDF, 18.4 MB, 158 pages) April 2022 NEO Energy (SNS) Limited -          - -           WHPS will be recovered to shore for reuse, recycling or disposal. Trenched and buried sections of pipelines will be left in situ, removing the pipeline ends. Exposed concrete mattresses and grout bags will be recovered to shore. -          April 2022   
Wenlock DP (PDF, 4.72 MB, 51 pages) Wenlock CA (PDF, 3.84 MB, 44 pages) Wenlock EA (PDF, 6.74 MB, 119 pages) February 2022 Alpha Petroleum Resources Limited Energean UK Ltd -          Platform, mid line tee protection structure, exposed tie-in spools and stabilisation features will be removed to shore. Trenched and buried pipelines will remain in situ. -          February 2022   
Cormorant Alpha Topsides DP (PDF, 3.91 MB, 81 pages) Cormorant Alpha Topsides EA (PDF, 8.21 MB, 117 pages) February 2022 TAQA Bratani Limited -          - -          Topsides Recovered to shore for reuse/recycling or disposal -          February 2022     
Caledonia Decommissioning Programme (PDF, 3.1 MB, 50 pages) Caledonia Comparative Assessment (PDF, 2.04 MB, 64 pages) Caledonia Environmental Assessment (PDF, 5.56 MB, 113 pages) February 2022 Premier Oil UK Limited -          - -          Subsea installations, trenched and buried flexible pipelines, umbilicals, spools and jumpers returned to shore for recycling or disposal, Trenched and buried rigid pipelines will be left in situ. -          February 2022   
Thistle Topsides Decommissioning Programme (PDF, 3.11 MB, 38 pages) December 2021 EnQuest Heather Limited -          - -          Recovery of topsides to shore for reuse, recycling or disposal -          December 2021   
Indefatigable 18A Topsides Decommissioning Programme (PDF, 1.29 MB, 50 pages) December 2021 Perenco UK Limited -          - -          Recovery of topsides to shore for reuse, recycling or disposal -          December 2021   
Banff and Kyle Decommissioning Programmes (PDF, 3.23 MB, 71 pages) Banff and Kyle Environmental Appraisal (PDF, 7.07 MB, 114 pages) Banff and Kyle Comparative Assessment (PDF, 2.75 MB, 106 pages) November 2021 CNR International (U.K.) Limited -          - -          Subsea installations, mooring piles, chains and surface laid pipelines returned to shore for reuse, recycling or disposal. Trenched pipelines will be left in situ. -          November 2021   
Ensign installation DP (PDF, 2.52 MB, 37 pages) Ensign Pipelines DP (PDF, 1.99 MB, 42 pages) Ensign CA (PDF, 1.67 MB, 48 pages) Ensign EA (PDF, 9.45 MB, 134 pages) August 2021 Spirit Energy North Sea Limited -          - -          Installations and all exposed grout bags and concrete mattresses will be recovered to shore for reuse or recycling. Buried pipelines will be left in situ with exposed ends cut and removed. Concrete Plinths and existing rock will be left in situ. -          August 2021   
Conrie, Don SW, W Don and Ythan Decommissioning Programmes (PDF, 7.29 MB, 88 pages) Don SW and W Don Comparative Assessment (PDF, 5.33 MB, 76 pages) Conrie, Don SW, W Don and Ythan Environmental Appraisal (PDF, 8.07 MB, 132 pages) August 2021 EnQuest Heather Limited -          - -          Installations, surface laid pipelines and associated concrete mattresses and grout bags will be recovered to shore for reuse, recycling or disposal. Trenched and buried sections of pipelines and existing rock dump will be left in situ. -          August 2021   
Fulmar and Auk North Topsides, Subsea Facilities and Pipelines Decommissioning Programme (PDF, 3.83 MB, 78 pages) Fulmar and Auk North Subsea Infrastructure and Pipelines Comparative Assessment (PDF, 4.63 MB, 144 pages) Fulmar & Auk North Environmental Appraisal (PDF, 5.17 MB, 114 pages) July 2021 Repsol Sinopec Resources UK Limited -          - -          Removal of topsides and subsea installations to shore for reuse, recycling or disposal. Trenched and buried pipelines will be left in situ. Tie-in spools and trench transition sections of the pipelines shall be cut, recovered and returned to shore for recycling. Exposed remaining sections of pipe shall be rock covered. -          July 2021   
Heather Topsides Decommissioning Programme (PDF, 4.07 MB, 43 pages) July 2021 EnQuest Heather Limited -          - -          Recovery of topsides to shore for reuse, recycling or disposal -          July 2021   
Kingfisher Decommissioning Programme (PDF, 2.95 MB, 76 pages) Kingfisher CA (PDF, 2.19 MB, 51 pages) Kingfisher EA (PDF, 3.48 MB, 119 pages) June 2021 Shell U.K. Limited -          - -          Removal of installations to shore for recycling or reuse. Trenched and/or buried pipeline sections will be decommissioned in situ. The end of the pipelines will be cut, and additional rock cover will be added to cut ends to reduce snagging risk. -          June 2021   
Gaupe Decommissioning Programme (PDF, 1.86 MB, 47 pages) Gaupe CA (PDF, 1.32 MB, 51 pages) Gaupe EA (PDF, 5.77 MB, 113 pages) May 2021 A/S Norske Shell -          - -          Full removal of SSIV, full removal of risers. Partial removal of pipelines and umbilicals. -          May 2021   
PL301 Heimdal to Brae Pipeline Decommissioning Programme (PDF, 7.71 MB, 53 pages) PL301 Heimdal to Brae Pipeline Comparative Assessment (PDF, 6.77 MB, 55 pages) PL301 Heimdal to Brae Environmental Appraisal (PDF, 9.64 MB, 114 pages) April 2021 Equinor Energy AS -          - -          Majority of pipeline will be left in situ with rock placement over spans/exposures. 20m surface laid section of pipeline out with the existing trench to be removed and recovered to shore. -          April 2021   
Hunter & Rita Decommissioning Programme (PDF, 2.1 MB, 44 pages) Hunter & Rita CA (PDF, 1.99 MB, 79 pages) Hunter & Rita EA (PDF, 4.96 MB, 131 pages) April 2021 Premier Oil E&P UK Limited -          - -          Subsea installations, Trenched & buried Flexible Flowlines & Umbilicals Rigid Spool pieces and jumpers will be returned to shore for recycling or disposal. Trenched and buried pipelines, failed flexible flowlines and umbilical will be left in situ. Exposed ends & areas of exposure to be removed & returned to shore for recycling or disposal. Local rock placement will be used to mitigate snag hazard from cut ends. -          April 2021   
LOGGS PR, LOGGS PC, LOGGS PP, LOGGS PA, North Valiant PD, & Associated Pipelines – LDP5 (PDF, 12.2 MB, 99 pages) Chrysaor Production (U.K.) Limited April 2021 -          - -          Removal of topsides and jackets to shore for recycling or disposal. Buried pipelines associated with PP will be left in situ and the riser sections of pipelines will be removed to shore for reuse or recycling with the PP and PR jackets. -          April 2021   
Windermere Decommissioning Programme (PDF, 1.95 MB, 41 pages) Windermere CA (PDF, 802 KB, 34 pages) Windermere ES (PDF, 7.86 MB, 231 pages) March 2021 INEOS UK SNS Limited - 1.Removal Scheduleof Extensiontopsides and jacket to 31/12/2025shore &for Changerecycling or disposal. The pipelines will be partially removed, the exposed sections adjacent to decomthe solutionplatforms forwill coveringbe pipelineremoved and recycled or disposed onshore. The exposed ends will be lowered to useachieve rockadequate ratherdepth thanof backfillcoverage. JanuaryThe 2024existing buried sections of umbilical will be left in situ. All concrete mattresses and grout bags will be recovered to shore for reuse, recycling or disposal. -          March 2021   
Hewett Decommissioning Programme (PDF, 5.76 MB, 69 pages) Hewett Environmental Appraisal (PDF, 16.9 MB, 134 pages) March 2021 ENI Hewett Limited -          - -          All 6 platforms will be removed and returned to shore for processing/recycling or disposal March 2021   
Buchan & Hannay Decommissioning Programme (PDF, 3.33 MB, 57 pages) Buchan & Hannay CA (PDF, 3.83 MB, 91 pages) Buchan & Hannay EA (PDF, 8.29 MB, 115 pages) March 2021 Repsol Sinopec Resources UK Limited -          - -          Subsea installations and surface laid pipelines will be removed to shore for either reuse, disposal or recycling. Buried and stable pipelines will be left in situ. -          March 2021   
Huntington Decommissioning Programme (PDF, 2.52 MB, 41 pages) Huntington CA (PDF, 1.86 MB, 62 pages) Huntington EA (PDF, 5.01 MB, 127 pages) March 2021 Premier Oil E&P UK Limited -          - -          Subsea installations, Trench and Buried flexible pipelines, umbilicals, spools and jumpers will be returned to shore for recycling or appropriate treatment and disposal. Trenched and buried rigid, stable pipelines will be left in situ. -          March 2021   
Northern Producer FPF and Don SW + W Don riser disconnection (PDF, 4.89 MB, 58 pages) March 2021 Submitted jointly by Qualimar Shipping Company Limited and EnQuest Heather Limited -          - -          Removal for reuse, recycling or disposal of Northern Producer FPF, Mooring and anchor systems, mid water arch and risers and Pipeline sections and exposed mattresses within the 500m safety zone -          March 2021   
Balmoral Decommissioning Programme (PDF, 4.27 MB, 65 pages) Balmoral Area CA (PDF, 2.56 MB, 116 pages) Balmoral Area EA (PDF, 8.03 MB, 196 pages) February 2021 Premier Oil E&P UK Limited -          - -          The Balmoral FPV will be towed to a suitable location for re-sale, reuse, recycling or disposal. The mooring chains will be recovered to the point of burial at the anchor pile. Subsea installations will be returned to shore for recycling or appropriate treatment and disposal. Trenched and buried rigid, stable pipelines will be left in situ. Trenched and buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal -          February 2021   
Brenda Decommissioning Programme (PDF, 1.76 MB, 47 pages) February 2021 Premier Oil E&P UK Limited -          - -          Subsea installations will be returned to shore for recycling or appropriate treatment and disposal. Trenched and buried rigid, stable pipelines will be left in situ. Trenched and buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal. -          February 2021   
Glamis Decommissioning Programme (PDF, 2.53 MB, 46 pages) February 2021 Premier Oil E&P UK Limited -          - -          Subsea installations will be returned to shore for recycling or appropriate treatment and disposal. Trenched and buried rigid, stable pipelines will be left in situ. Trenched and buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal. -          February 2021   
Nicol Decommissioning Programme (PDF, 1.68 MB, 45 pages) February 2021 Premier Oil E&P UK Limited -          - -          Subsea installations will be returned to shore for recycling or appropriate treatment and disposal. Trenched and buried rigid, stable pipelines will be left in situ. Trenched but not backfilled umbilicals will be fully removed by reverse reeling, with deburial, and returned to shore for reuse, recycling or appropriate treatment and disposal. Trenched and buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal -          February 2021   
Stirling Decommissioning Programme (PDF, 3.13 MB, 44 pages) February 2021 Premier Oil E&P UK Limited -          - -          Trenched and buried rigid, stable pipelines will be left in situ. Trenched and buried flexible pipelines, umbilicals, spools and jumpers will be removed to shore for recycling or appropriate treatment and disposal. -          February 2021   
Topaz Decommissioning Programme (PDF, 2.21 MB, 31 pages) Topaz CA (PDF, 504 KB, 15 pages) Topaz EA (PDF, 1.22 MB, 37 pages) February 2021 INEOS UK SNS Limited - 1.Wellhead ScheduleProtection ExtensionStructure, will be returned to 31/12/2025shore &for Changerecycling toor decomappropriate solutiontreatment forand coveringdisposal. The Trenched and Buried, stable pipeline endsand toumbilical usewill rockboth ratherbe thanleft backfillin Januarysitu.February 20242021 -             
North Cormorant DP (PDF, 2.56 MB, 50 pages) North Cormorant EA (PDF, 7.26 MB, 93 pages) November 2020 TAQA Bratani Limited -          - -          Removal to shore for recycling or reuse -          November 2020   
Tern Topsides - Decommissioning Programme (PDF, 2.84 MB, 52 pages) Tern Topsides EA (PDF, 7.03 MB, 91 pages) November 2020 TAQA Bratani Limited -          - -          Removal to shore for recycling or reuse -          November 2020   
Fulmar & Auk North Preparation Work Scopes Decommissioning Programme (PDF, 1.53 MB, 35 pages) November 2020 Repsol Sinopec North Sea Limited -          - -          preparation work scopes relating to the Fulmar and Auk North installations -          November 2020   
East Brae Topsides and Braemar Decommissioning Programmes (PDF, 3.88 MB, 62 pages) September 2020 RockRose UKCS8 LLC TAQA Bratani Limited -          Removal of topsides and subsea installations to shore for reuse or recycling. Removal to shore of surface laid pipelines. Trenched and buried pipelines to remain in situ -          September 2020   
Brent Alpha Jacket (PDF, 2.82 MB, 101 pages) July 2020 Shell U.K. Limited -          - -          Jacket to be removed to 84.5m below sea level for removal to shore for recycling/disposal. Footings to remain in situ -          July 2020   
Amethyst A1D, A2D, B1D & C1D Topsides (PDF, 2.42 MB, 43 pages) July 2020 Perenco UK Limited -          - -          Removal of topsides to shore for reuse, recycling or disposal -          July 2020   
Anglia Decommissioning Programme (PDF, 2.18 MB, 61 pages) Anglia CA (PDF, 3.74 MB, 49 pages) Anglia EA (PDF, 5.83 MB, 120 pages) June 2020 Ithaca Energy UK Limited -          - -          Removal of topsides and jacket to shore for recycling or reuse. Pipelines will remain in-situ. All tie-in spools for the 8” import line, 12” export line and 3” Methanol line will be completely removed. Partial removal of 6” umbilical. -          June 2020   
Brynhild Pipelines (PDF, 1.98 MB, 50 pages) June 2020 Lundin Energy Norway AS Aker BP ASA -The trenched and buried sections of pipelines and umbilicals will be decommissioned in situ. The exposed sections will be remediated by either cut with removal to shore, trench and burial or rock cover. Exposed mattresses will be removed to shore for reuse, recycling or disposal. The PLET, support frames and protection covers will be completely removed to shore for reuse, recycling or disposal. June 2020 Brynhild Pipelines Close Out Report (PDF, 2.86 MB, 25 pages) March 2024 
Cormorant Alpha Derrick Structure Removal (PDF, 4.28 MB, 57 pages) June 2020 TAQA Bratani Limited -          - -          Removal of drilling derrick structure and installation of modular drilling rig to facilitate well P&A June 2020 Cormorant Alpha Derrick Structure Removal Close Out Report (PDF, 5.17 MB, 38 pages) December 2023 
Cavendish (PDF, 2.4 MB, 40 pages) June 2020 INEOS UK SNS Limited - 1.Removal Schedule Extension to 31/12/2024shore Augustof 2022topsides 2.and Schedulejacket. ExtensionPartial toremoval 31/12/2025of &pipelines Change(buried tosections decomleft solutionit forsitu).June covering pipeline ends to use rock rather than backfill January 20242020 -             
Banff and Kyle FPSO and FSO Float Off (PDF, 3.45 MB, 39 pages) May 2020 CNR International (U.K.) LimitedLimited. -          - -          Removal of FPSO and FSO to shore for redeployment. The STL Buoy and associated mooring lines will be removed to shore for recycling. Associated riser sections and umbilicals within the water column will be removed to shore for recycling May 2020 Banff and Kyle FPSO and FSO Float Off Interim Close Out Report (PDF, 2.31 MB, 36 pages) May 2021 
Eider Topsides DP (PDF, 2.38 MB, 50 pages) May 2020 TAQA Bratani Limited -          - -          Removal of topsides to shore for recycling or reuse -          May 2020   
Ganymede, Europa, Callisto and NW Bell – LDP3 (PDF, 4.85 MB, 101 pages) May 2020 Chrysaor Production (U.K.) Limited -          - -          Removal of topside and jackets to shore. NW Bell pipelines will be recovered to shore. Ganymede, Europa and Callisto interfield pipelines will be decommissioned in situ. -          May 2020   
Ganymede ZD Topsides - LDP3b (PDF, 2.31 MB, 46 pages) April 2020 Chrysaor Production (U.K.) Limited -          - -          Removal of topsides to shore for recycling or reuse. -          April 2020   
Huntington FPSO (Voyageur Spirit) (PDF, 1.19 MB, 21 pages) April 2020 Premier Oil E&P UK Limited -          - -          The Huntington FPSO (Voyageur Spirit) is to be floated off station and redeployed. The risers and mooring system will be removed and taken to shore -          April 2020   
Caister - CDP1a (PDF, 2.93 MB, 49 pages) March 2020 Chrysaor Production (U.K.) Limited -          - -          Topsides and Jacket and associated sections of pipeline risers attached to the Caister platform removed to shore for recycling or reuse. -          March 2020   
Alma & Galia DPs (PDF, 4.34 MB, 61 pages) March 2020 EnQuest Heather Limited -          - -          Removal of FPSO to shore for recycling. Partial removal of the mooring anchor piles. The mooring chain will be cut locally to the mooring pile and buried to 1m below seabed. Removal of manifolds, wellhead protection structures and pipelines. -          March 2020   
Brent Field Pipelines (PDF, 4.05 MB, 130 pages) March 2020 Shell U.K. Limited -          - -          Removal to shore for recycling/disposal, trench/backfill, buried pipelines left in situ -          March 2020    
Thistle COS Tanks (PDF, 3.34 MB, 59 pages) January 2020 EnQuest Heather Limited -          - -          Removal of crude oil storage tanks to shore for recycling -          January 2020   
Banff SAL Buoy (PDF, 996 KB, 20 pages) November 2019 CNR International (U.K.) Limited. Decommissioning Programmes submitted by Teekay Petrojarl Floating Production UK Ltd. -          - -          Removal of subsea installations to shore for either reuse or recycling. Part of pipeline to be returned to shore for recycling  November 2019 Banff SAL Buoy Interim Close Out Report (PDF, 1.22 MB, 12 pages) May 2021 
MacCulloch Decommissioning Programmes (PDF, 1.36 MB, 40 pages) November 2019 Chrysaor Production (U.K.) Limited -          - -          The anchors will be decommissioned in situ. All other installations and pipelines will be removed to shore for either reuse or recycling -          November 2019   
Goldeneye (PDF, 3.41 MB, 53 pages) November 2019 Shell U.K. Limited -          - -          Removal of topsides, jacket and sections of pipelines from the Goldeneye Platform up to but excluding the main pipeline tie-in flanges to shore for reuse or recycling. -          November 2019     
Brae Alpha West Drilling Rig (PDF, 2.2 MB, 24 pages) September 2019 RockRose Energy UKCS8 LLC TAQA Bratani Limited -Removal of the drilling rig to shore for recycling or disposal September 2019 Brae Alpha West Drilling Rig Close Out Report (PDF, 1.68 MB, 24 pages) April 2024 
South Morecambe DP3/DP4 (PDF, 2.72 MB, 57 pages) September 2019 Spirit Energy Production UK Limited -          - -          Removal of topsides and jackets to shore for either reuse or recycling. Buried and stable pipelines left in situ, exposed pipeline ends cut and recovered to shore for either reuse or recycling -          September 2019   
Pickerill A&B Installations (PDF, 1.79 MB, 54 pages) September 2019 Perenco Gas (UK) Limited - 1.Removal Scheduleof Extensiontopsides and jackets to 31/12/2024shore Februaryfor 2022either reuse or recycling. -          September 2019       
Minke Decommissioning Programmes (PDF, 8.56 MB, 59 pages) September 2019 Neptune E&P UKCS Limited - 1.Removal Scheduleof ExtensionWHPS and small surface laid sections of pipelines to 31/12/2024shore Julyfor 2021reuse or recycling. Buried sections of pipelines to be left in situ -          September 2019     
Ketch (PDF, 2.65 MB, 60 pages) August 2019DNO North Sea (ROGB) Limited-1. Allow for installation of UKNG Viking Cable & Change in decom solution of pipelines to full removal June 2022 2. Include pipeline and fibre optic crossings into DP & Change in decom solution for pipelines remaining under rock berms & additional rock dump on pipeline ends September 2022 3. To alter the S29Holders November 2023 4. Change in decom solution of pipeline sections to leave in situ May 2024-            
Schooner (PDF, 4.97 MB, 63 pages) August 2019 DNO North Sea (ROGB) Limited - 1.Topsides, Allowjackets forand subsea installation ofremoved UKNGto Vikingshore Cablefor Junereuse, 2022recycling 2.or Todisposal. alterTrenched the S29Holders November 2023 3. Addition of WHPS to DP and itsburied removalpipelines &left Change in decomsituAugust solution of exposed pipeline sections to full removal May 20242019 -             
Juliet (PDF, 6.16 MB, 47 pages) August 2019 Neptune E&P UKCS Limited - 1.Removal Scheduleto Extensionshore of subsea installations and small surface laid sections of the pipeline and umbilical for either reuse or recycling; buried sections to 31/12/2024be Julyleft 2021in-situ -          August 2019     
Dunlin Alpha to Cormorant Alpha Pipeline - PL5 (PDF, 4.36 MB, 73 pages) July 2019 Fairfield Betula Limited -          - -          Trenched sections will be left in situ, exposed pipeline ends cut and recovered and severed ends rock dumped July 2019 PL5 Close Out Report (PDF, 4.74 MB, 27 pages) February 2021 
Ninian Northern Platform (PDF, 2.34 MB, 70 pages) CNR International (U.K.) Limited June 2019 -          - -          Topsides and jacket to top of footings to be removed to shore for recycling/disposal. Footings to remain in situ. -          June 2019   
Nevis N11 WHPS (PDF, 1.66 MB, 26 pages) June 2019 Apache Beryl I Limited -          - -          Removal of WHPS to shore for reuse or recycling June 2019 Nevis N11 WHPS Close out report (PDF, 1.86 MB, 25 pages) September 2022 
Dunlin Alpha Topsides (PDF, 4.97 MB, 44 pages) May 2019 Fairfield Betula Limited -          - -          Removal of topsides to shore for recycling or disposal -          May 2019   
Hewett (PDF, 1.5 MB, 21 pages) April 2019 Eni Hewett Limited ENI UK Limited -removal of Vent Stack & other preparatory works April 2019 Hewett Vent Stack Close Out Report (PDF, 595 KB, 11 pages) September 2021 
Pickerill A & B (PDF, 1.26 MB, 21 pages) March 2019 Perenco Gas (UK) Limited -          - -          removal of Telecommunication towers, sub-cellar deck equipment, appurtenances, caissons, associated tanks and lift pumps, supply hoses, a pipeline riser emergency shutdown valve and tertiary steelwork to shore for reuse, recycling or disposal -          March 2019   
Curlew B, C and D (PDF, 2.4 MB, 61 pages) March 2019 Shell U.K. Limited -          - -          FPSO, subsea installations, some pipelines removed to shore for recycling / disposal. Buried pipelines to remain in situ -          March 2019   
Viking Platforms, Vixen and associated Pipelines (VDP2) (PDF, 33.3 MB, 84 pages) January 2019 ConocoPhillips (U.K.) Limited -          - -          all platforms and subsea installations recovered to shore for reuse, recycling or disposal. Pipelines will be left in situ -          January 2019   
Victor (VDP3) (PDF, 21.1 MB, 55 pages) January 2019 ConocoPhillips (U.K.) Limited -          - -          Platform and subsea installation recovered to shore for reuse, recycling or disposal. Pipelines will be left in situ -          January 2019   
Tyne South Installations (PDF, 1.83 MB, 42 pages) January 2019 Perenco UK Limited -          - -          Topsides, jacket and subsea installation removed to shore for reuse, recycling or disposal -          January 2019   
Guinevere Installation (PDF, 2.05 MB, 43 pages) January 2019 Perenco UK Limited -          - -          Topsides and jacket removed to shore for reuse, recycling or disposal -          January 2019   
Beatrice Decommissioning Programmes (PDF, 4.45 MB, 88 pages) January 2019 Repsol Sinopec Resources UK Limited -          - -          AP Topsides, AD, Bravo and Charlie Platforms and AD Drilling Template removal to shore for reuse/recycling. Buried pipelines will be left in situ. Remediation for any exposed sections -          January 2019   
Bains Decommissioning Programmes (PDF, 2.57 MB, 36 pages) January 2019 Spirit Energy Production UK Limited -          - -          Subsea Installation removed to shore for reuse/recycling. Pipelines to be decommissioned in situ. -          January 2019   
Jacky (PDF, 2.34 MB, 52 pages) October 2018 Ithaca Energy (UK) Limited -          - -          Wellhead Platform and Midline Tee Structure removed to shore for either reuse or recycling. Pipelines are trenched and buried and will be left in situ -          October 2018   
Brae Bravo Topsides, Flare Bridge, Flare Tower and Flare Jacket and Substructure (PDF, 4.9 MB, 52 pages) August 2018 Marathon Oil UK LLC TAQA Bratani Limited -Brae Bravo Topsides, Flare Bridge, Flare Tower and Flare Jacket/Substructure removed to shore for either reuse or recycling August 2018 Brae Bravo Topsides Close Out Report (PDF, 3.29 MB, 36 pages) January 2024 
Brent Alpha, Bravo and Charlie Topsides (PDF, 3.34 MB, 81 pages) August 2018 Shell U.K. Limited -          - -          Topsides removed to shore for recycling/disposal -          August 2018   
Stirling A33 WHPS Decommissioning Programme (PDF, 1.13 MB, 27 pages) May 2018 Premier Oil E&P UK Limited -          - -          Subsea installation removed to shore for recycling May 2018 Stirling WHPS Close Out Report (PDF, 2.57 MB, 15 pages) February 2019 
Ann and Alison (PDF, 2.98 MB, 60 pages) April 2018 Spirit Energy North Sea Limited -          - -          installations and surface laid pipelines recovered to shore for either reuse or recycling. Buried and stable pipelines left in situ. -          April 2018   
Saturn (Annabel) (PDF, 2.49 MB, 47 pages) April 2018 Spirit Energy North Sea Limited -          - -          installations and surface laid pipelines recovered to shore for either reuse or recycling. Buried and stable pipelines left in situ. -          April 2018   
Audrey (PDF, 2.87 MB, 58 pages) April 2018 Spirit Energy North Sea Limited -          - -          Topsides and jackets removed to shore for recycling/disposal and surface laid pipelines recovered to shore for either reuse or recycling. Buried and stable pipelines left in situ. -          April 2018   
Rev Decommissioning Programme (PDF, 12 MB, 42 pages) April 2018 Repsol Norge AS -          - -          Buried and stable pipeline to be left in situ. Remaining pipelines recovered to shore along with mattresses. -          April 2018   
Markham ST-1 (PDF, 2.39 MB, 49 pages) February 2018 Centrica Production Nederland B.V. Spirit Energy Nederland B.V. -Platform removed to shore for reuse/recycling and pipelines to be left in situ. February 2018 Markham ST-1 Close Out Report (PDF, 6.19 MB, 68 pages) July 2021 
Osprey (PDF, 3.92 MB, 68 pages) December 2017 Fairfield Fagus Limited -          - -          Installation removed to shore for recycling/disposal. Full removal with the exception of the Bundles, Umbilical Risers within the Dunlin Alpha Concrete Gravity Based Structure or those trenched, and rock dumped. December 2017 Osprey Close Out Report (PDF, 1.71 MB, 34 pages) January 2021 
Merlin (PDF, 2.97 MB, 56 pages) December 2017 Fairfield Fagus Limited -          - -          Installation removed to shore for recycling/disposal. Full removal with the exception of trenched and rock dumped pipelines and umbilicals and umbilical riser within the Dunlin Alpha Concrete Gravity Based Structure. December 2017 Merlin Close Out Report (PDF, 1.47 MB, 27 pages) January 2021 
Dunlin Fuel Gas Import (DFGI) and Dunlin Power Import (DPI) (PDF, 3.48 MB, 54 pages) December 2017 Fairfield Fagus Limited -          - -          Installation removed to shore for recycling/disposal. Full removal with the exception of trenched and rock dumped pipelines and rigid riser and riser cable within the Dunlin Alpha Concrete Gravity Based Structure. December 2017 DFGI/DPI Close Out Report (PDF, 2.19 MB, 30 pages) January 2021 
Viking Satellites CD, DD, ED, GD, HD Pipelines (PDF, 6.77 MB, 32 pages) November 2017 ConocoPhillips (U.K.) Limited -          - -          All pipelines and associated mattresses to remain in situ. -          November 2017   
LOGGS Satellites Vulcan UR, Viscount VO, Vampire OD - LDP1 (PDF, 17.5 MB, 61 pages) November 2017 ConocoPhillips (U.K.) Limited -          - -          Topsides and jackets removed to shore for recycling/disposal. All pipelines and associated mattresses to remain in situ. -          November 2017   
Leman BH Decommissioning Programme (PDF, 4.66 MB, 46 pages) April 2017 Shell U.K. Limited -          - -          Topside and jacket removed to shore for reuse/recycling. April 2017 Leman BH Close Out Report (PDF, 1.71 MB, 25 pages) March 2019 
Ettrick and Blackbird (PDF, 2.1 MB, 62 pages) March 2017 Nexen Petroleum U.K Limited -          - -          FPSO removed for reuse at different location. Subsea equipment removed to shore for reuse/recycling. Buried pipelines to be left in situ with the remaining pipelines removed to shore. -          March 2017   
Ann A4 Decommissioning Programme (PDF, 1.37 MB, 29 pages) February 2017 Centrica North Sea Limited -          - -           WHPS to be removed to shore for reuse/recycling. -          February 2017   
Janice James & Affleck (PDF, 3.8 MB, 115 pages) September 2016 Maersk Oil UK Limited -          - -          FPSO removed to shore for recycling. Subsea equipment removed to shore for reuse/recycling. Buried pipelines to be left in situ with the remaining pipelines removed to shore. -          September 2016   
Athena Decommissioning Programmes (PDF, 3.88 MB, 70 pages) September 2016 Ithaca Energy (UK) Limited -          - -          FPSO removed for reuse at different location. Subsea equipment removed to shore for reuse/recycling. All pipelines to be removed to shore. -          September 2016   
Viking Platforms (PDF, 3.53 MB, 40 pages) September 2016 ConocoPhillips (U.K.) Limited -          - -          Topsides and jackets to be removed to shore for recycling/disposal. -          September 2016   
Leadon (PDF, 1.71 MB, 53 pages) March 2016 Maersk Oil North Sea UK Limited TotalEnergies E&P UK Limited -FPSO removed for reuse at different location. Removal of 2 x bundle towheads and mid-line structure to shore for disposal; removal of 2 x drill centres to shore for disposal. 2 x pipeline bundles to be left in situ, partial removal of gas import pipeline. March 2016 Leadon Close Out Report (PDF, 7.78 MB, 31 pages) February 2023 
Harding STL (PDF, 2.61 MB, 73 pages) December 2015 TAQA Bratani Limited -          - -          Harding Submerged Turret Loading (STL) System to be replaced by new Offshore Loading System. STL to be removed to shore for recycling/disposal and shuttle tanker mooring and loading buoy interfaces returned to owner. December 2015 Harding STL Close-Out Report (PDF, 1.62 MB, 26 pages) June 2017 
Thames Area – Horne & Wren (PDF, 1.57 MB, 48 pages) November 2015 Tullow Oil SK Limited -          - -          Removal of topsides and jackets to shore for recycling/disposal. Pipelines to remain buried in situ. -          November 2015   
Thames Area – Orwell (PDF, 828 KB, 42 pages) November 2015 Tullow Oil SK Limited -          - -          Removal of subsea installations to shore for recycling/disposal. Pipelines to remain buried in situ. -          November 2015   
Thames Area – Wissey (PDF, 1.26 MB, 43 pages) November 2015 Tullow Oil SK Limited -          - -          Removal of subsea installations to shore for recycling/disposal. Pipelines to remain buried in situ. -          November 2015   
Thames Area – Thames Complex (PDF, 15.9 MB, 76 pages) October 2015 Perenco UK Limited - 1. Removal of pipelinetopsides fromand thejackets programmeto Marchshore 2018for 2.recycling/disposal. ScheduleRemoval Extensionof subsea installations to 31/12/2023shore Marchfor 2019recycling/disposal. Pipelines to remain buried in situ. -          October 2015   
Thames Area – Gawain (PDF, 3.8 MB, 47 pages) October 2015 Perenco UK Limited - 1.Removal Scheduleof Extensionsubsea installations to 31/12/2022shore Marchfor 2019recycling/disposal. 2.Pipelines Scheduleto Extensionremain toburied 31/12/2024in Septembersitu.October 20222015 -             
Thames Area – Arthur (PDF, 4.41 MB, 46 pages) October 2015 Perenco UK Limited - 1.Removal Scheduleof Extensionsubsea installations to 31/12/2022shore Marchfor 2019recycling/disposal. 2.Pipelines Scheduleto Extensionremain toburied 31/12/2024in Marchsitu.October 20222015 -             
Brent - Brent Delta Topside (PDF, 3.55 MB, 72 pages) July 2015 Shell U.K. Limited -          - -          Removal of topside to shore for recycling and disposal. July 2015 Brent Delta Topside Close Out Report (PDF, 4.42 MB, 53 pages) February 2020 
Rose Decommissioning Programmes (PDF, 2.87 MB, 42 pages) May 2015 Centrica Resources Limited -          - -          Removal of subsea installations to shore for recycling/disposal. Removal of sections of untrenched pipelines, trenched pipelines to remain in situ. May 2015 Rose Close Out Report (PDF, 3.31 MB, 36 pages) October 2018 
Stamford (PDF, 2.71 MB, 39 pages) April 2015 Centrica North Sea Gas Limited -          - -          Removal of subsea installations to shore for recycling/disposal. Removal of sections of untrenched pipelines, trenched pipelines to remain in situ. April 2015 Stamford Close Out Report (PDF, 2.66 MB, 36 pages) February 2019 
Murchison (PDF, 2.37 MB, 70 pages) August 2014 CNR -          - -          Removal of topsides and jackets to shore for recycling/disposal. Footings to remain in situ. Export pipeline to remain in situ with remedial rock placement. Infield Flowlines to be removed for recycling/disposal. -          August 2014   
Rubie & Renee (PDF, 2.47 MB, 50 pages) April 2014 Endeavour Energy UK Limited -          - -          Removal of subsea installations to shore for recycling/disposal. Selective recovery of pipelines. April 2014 Rubie Renee Decommissioning Close Out Report (PDF, 9.98 MB, 66 pages) September 2021 
Miller (PDF, 6.57 MB, 198 pages) December 2013 BP Exploration (Alpha) Limited -          - -          Footings to remain in situ. Steel topsides and jacket to top of footings to be removed to shore. -          December 2013   
Schiehallion & Loyal Phase One (PDF, 1.84 MB, 60 pages) April 2013 Britoil Limited -          - -          FPSO removed for potential reuse. Pipeline recovery where possible. Production pipelines to remain in situ. April 2013 Schiehallion & Loyal Phase One Close Out Report (PDF, 1010 KB, 22 pages) May 2019 
IVRR - decommissoning programme (PDF, 1.57 MB, 102 pages) February 2013 Hess Limited -          - -          FPSO removed for reuse at different location. Removal of subsea installations to shore for recycling/disposal. Selective recovery of pipelines. February 2013 IVRR Close Out Report (PDF, 4.74 MB, 35 pages) December 2015 
Camelot (PDF, 488 KB, 39 pages) June 2012 Energy Resource Technology (UK) Limited -          - -          Removal of platform to shore for recycling/disposal. Pipelines to remain in situ. June 2012 Camelot Close out report (PDF, 2.27 MB, 41 pages) August 2013 
Fife, Flora, Fergus, Angus: decommissioning programme (PDF, 8.36 MB, 135 pages) February 2012 Hess Limited -          - -          FPSO removed for reuse at different location. Removal of subsea installations to shore for recycling/disposal. Removal of untrenched pipelines, trenched pipelines to remain in situ. February 2012 FFFA Close Out Report (PDF, 1.49 MB, 33 pages) December 2014 
Don (PDF, 8 MB, 175 pages) May 2011 Britoil Public Limited Company -          - -          Removal of subsea installation to shore for recycling/disposal. Pipelines to remain in situ with selective recovery. -          May 2011   
Welland DP (PDF, 1.74 MB, 39 pages) September 2010 Perenco UK Limited -          - -          Removal of subsea installation to shore for recycling/disposal. Pipelines to remain in situ with selective recovery. September 2010 Welland Close Out Report (PDF, 7.42 MB, 130 pages) September 2020 
Tristan NW DP (PDF, 4.11 MB, 119 pages) August 2010 Silverstone Energy Limited Bridge Energy UK Limited Removal of subsea installation to shore for recycling. Production pipeline with piggy-backed umbilical - leave in situ; jumpers, spool pieces and associated pipeline equipment - remove to shore for re-use or recycling. August 2010 Tristan NW close out report (PDF, 2.3 MB, 23 pages) January 2011 
Shelley DP (PDF, 3.23 MB, 83 pages) June 2010 Premier Oil -          - -          FPSO removed for reuse at different location. Removal of subsea installations to shore for recycling/disposal. Production pipeline to remain in situ. Umbilical removed in sections. June 2010 Shelley close out report (PDF, 4.49 MB, 62 pages) February 2012 
Kittiwake Sal DP (PDF, 4.28 MB, 87 pages) June 2009 Venture North Sea Oil Limited -          - -          SAL Assembly - removal to shore for re-use. Revision to approved decommissioning programme: Completion of the removal of the SAL Assembly extended to 31 July 2012. The flexible flowline removed to shore for re-use. June 2009 Kittiwake Sal close out report (PDF, 588 KB, 13 pages) July 2012 
MCP-01 DP (PDF, 7.41 MB, 336 pages) September 2007 Total E&P UK Limited -          - -          Concrete substructure to remain in situ; topsides to be removed to shore for re-use, recycling or disposal. September 2007 MCP-01 close out report (PDF, 23.1 MB, 113 pages) March 2013 
Kittiwake Buoy DP (PDF, 3.46 MB, 118 pages) May 2008 Venture North Sea Oil Limited -          - -          Exposed Location Single Buoy Mooring System (ELSBM) removal to shore for recycling or disposal. -          May 2008   
Linnhe (PDF, 2.25 MB, 66 pages) July 2008 Mobil North Sea LLC -          - -          Removal of WHPS to shore for recycling. Removal of subsea installations to shore for recycling/disposal. Pipelines to remain in situ; pipeline sections outside trenches removed to shore. July 2008 Linnhe Close Out Report (PDF, 1000 KB, 22 pages) November 2013 
Indefatigable (Shell) (PDF, 11.6 MB, 224 pages) May 2007 Shell UK Limited -          - -          Removal of installations to shore. Infield and export pipelines to remain in situ; hose bundles removed to shore. May 2007 Close Out Report (PDF, 2.47 MB, 64 pages) December 2014 
NW Hutton: decommissioning programme (PDF, 14.9 MB, 320 pages) February 2006 Amoco (U.K.) Exploration Company - now a subsidiary of BP plc -          - -          Footings to remain in place, steel topsides and jacket to top of footings to be removed to shore. Pipelines to remain in situ. February 2006 Close Out Report (PDF, 2.52 MB, 32 pages) October 2014 
Ardmore 2005 British American Offshore Limited -          - -          Mobile Jack-Up rig removed for reuse. -          2005   
Ardmore 2005 Ugland Nordic Shipping AS -          - -          Single Anchor Loading Systems to be removed to shore for reuse. Pipelines to be removed for reuse -          2005   
Ardmore 2005 Acorn Oil & Gas Limited -          - -          Subsea equipment including guide frame removed to shore. -          2005   
Brent Flare DP (PDF, 2.93 MB, 122 pages) 2004 Shell -          - -          Brent Flare removal to shore for recycling and disposal. -          2004   
Beatrice 2004 Talisman Energy (UK) Limited -          - -          Platforms to be removed for reuse. -          2004   
Forbes and Gordon 2003 BHP Billiton -          - -          Pipelines to be left in situ - retrench any area of pipeline with less than 0.4m depth of cover. May 20052003  -May 2005
Frigg DP (PDF, 10 MB, 450 pages) May 2003 Total E&P Norge AS -          - -          Concrete substructures to remain in place; concrete topsides to be removed to shore; steel installations to be removed to shore; infield pipelines to be removed to shore May 2003 Frigg close out report (PDF, 3.46 MB, 62 pages) May 2011 
Durwood and Dauntless 2002 Amerada Hess -          - -          Pipelines to be left in situ. -          2002   
Hutton 2002 Kerr McGee -          - -          Tension Leg Platform to be removed for reuse. 1 pipeline to be removed to shore. 1 pipeline to be left in situ. July 20042002  -July 2004
Camelot CB 2001 ExxonMobil -          - -          Platform to be removed for reuse or recycling. -          2001   
Blenheim and Bladon 2000 Talisman -          - -          FPSO to be removed for reuse. Pipelines to be removed to shore. -          2000   
Durwood and Dauntless 2000 Amerada Hess -          - -          FPSO to be removed for reuse. Subsea facilities removal to shore. -          2000   
Maureen and Moira 2000 Phillips -          - -          Platform removal to shore for reuse or recycling. Concrete Loading Column removal to shore for reuse or recycling. 2 pipelines removal to shore. 1 pipeline to be left in situ. -          2000   
Brent Spar 1998 Shell -          - -          Oil Storage and Loading Facility to be removed for reuse as part of quay extension. Brent Spar Anchor Blocks - removal to shore for reuse, recycling or disposal -          1998   
Donan 1998 BP -          - -          FPSO to be removed for reuse. -          1998   
Fulmar SALM 1998 Shell -          - -          Single Anchor Leg Mooring Buoy to be removed to shore. Pipeline to be left in situ. -          1998   
Emerald 1996 MSR -          - -          FPSO to be removed for reuse. Pipeline to be left in situ. -          1996   
Frigg FP 1996 Elf Norge TotalFinaElf Norge -          Flare column to be removed to shore. -          1996   
Leman BK 1996 Shell -          - -          Platform removal to shore. -          1996   
Staffa 1996 Lasmo -          - -          Pipeline to be removed to shore. -          1996   
Viking AC, AD, AP & FD 1996 Conoco -          - -          Platforms to be removed to shore. -          1996   
Esmond CP & CW 1995 BHP -          - -          Platforms to be removed to shore. -          1995   
Gordon BW 1995 BHP -          - -          Platform to be removed to shore. -          1995   
Angus 1993 Amerada Hess -          - -          FPSO to be removed for reuse. -          1993   
Forbes AW 1993 Hamilton BHP -          Platform to be removed to shore. -          1993   
Argyll, Duncan and Innes 1992 Hamilton BHP -          FPSO to be removed to shore. Catenary Anchor Leg Mooring (CALM) Buoy to be removed to shore. Pipelines to be removed to shore. -          1992   
Blair 1992 Sun Oil AGIP -          1 pipeline removal for reuse. 1 pipeline to be left in situ. -          1992   
Crawford 1991 Hamilton Oil BHP -          FPF to be removed to shore. Catenary Anchor Leg Mooring (CALM) Buoy to be removed to shore. Subsea facilities removal to shore. -          1991   
Piper Alpha 1988 Occidental Talisman -          Platform left in situ. -          1988   

Notification of disused pipelines

During the course of a field’s life, pipelines/sections of pipelines may be taken out of use, e.g. due to corrosion, problems with reservoir pressure, damage to the pipeline, etc. When this happens, under the Petroleum Act 1998 the Secretary of State has the option of immediately calling for a full decommissioning programme. This is not always considered an appropriate option however, and so it has been agreed consideration will be given to handling suitable pipelines, under an informal decommissioning regime, thereby deferring a formal programme until the end of the field’s life.

If a formal decommissioning programme is not immediately deemed suitable, details of the out of use pipeline(s) will be circulated to other government departments for comment. Following this, OPRED will decide one of the following:

  • we are content with the proposals for monitoring and maintaining the out-of-use pipeline
  • we request additional information or further remedial action
  • we request a formal decommissioning programme

The Interim Pipeline Regime is intended to ensure out of use lines do not pose a risk to other users of the sea or the environment and that they are covered by an appropriate surveying and maintenance regime from the point when they are taken out of use until approval of the formal decommissioning programme, which is usually at the end of field life. It should be noted that any interim solution should not prejudice the final decommissioning options for that line, including complete removal. The department expects operators to submit details of out of use pipelines/sections of a pipeline as soon as they are taken out of use.

Operators are reminded that any works that are proposed on any pipelines under the Pipeline Works Authorisation regime, as per their Terms and Conditions of the PWA, must have a legal consent in place before works can commence which includes but is not exclusive to any proposed decommissioning works. Consents are issued by the North Sea Transition Authority (NSTA) and operators are requested to email consents@nstauthority.co.uk on any queries that they may have relating to legal consents. Further guidance can also be found on the NSTA website.

Once the necessary legal consent has been issued by NSTA, Consents & Authorisations Section, Operators are to email a completed IPR1 Form (MS Word Document, 63.7 KB) to odu@energysecurity.gov.uk.

If you are an operator, aware of any out of use pipelines that have not been referred to the department, please submit a completed IPR1 Form at your earliest convenience.

Following confirmation a pipeline has been accepted under the Interim Pipeline Regime, the Offshore Decommissioning Unit will continue to monitor the condition of the pipeline by asking the Operator to confirm the status of the pipeline remains unchanged following future surveys at an agreed frequency. If you are an operator who wishes to request a change to the agreed frequency of surveys following acceptance of a pipeline into the IPR, please submit a completed IPR2 Form (MS Word Document, 53.4 KB) to odu@energysecurity.gov.uk. Please note that a recent survey (done that year) must have been completed before any change of survey frequency will be considered.

Further information

A list of all installations on the UKCS and their current status is available from the OSPAR Website

At the first ministerial meeting of the Commission for the Protection of the Marine Environment of the North East Atlantic (OSPAR) in 1998, a binding decision was agreed that set rules for the disposal of offshore installations at sea. Under the decision the dumping and leaving wholly or partly in place of offshore installations is prohibited. Decision 98/3 recognises it may be difficult to remove the ‘footings’ of large steel jackets weighing more than 10,000 and concrete installations. As a result there are derogations for these categories of installations if the internationally agreed assessment and consultation process shows leaving them in place is justifiable.

OPRED has utilised decommissioning programme templates for derogation and non-derogation projects. These templates include all required content as detailed in Annex C of the guidance notes. There are also templates available which are currently being trialled for more specific and small scale decommissioning activity including rig reactivation and removal of a single Wellhead Protection Structure. Operator’s should discuss all individual cases with OPRED who will advise of the appropriate template.

A Standard Decommissioning Programme Template (Non-Derogation Cases) (PDF, 1.03 MB, 34 pages) is available - (November 2018).

A Standard Decommissioning Programme Template (Derogation Cases) (PDF, 1.11 MB, 37 pages) is also available (November 2018).

A word version of these templates can also be requested from OPRED. Please email odu@energysecurity.gov.uk for further details.

Cost recovery

OPRED will charge a fee in respect of offshore (oil and gas) installations and pipelines decommissioning programmes under the Petroleum Act 1998. Guidance, including the indicative fee structure, is available in Guidance on charging a fee for offshore (oil and gas) installations and pipelines under the Petroleum Act 1998 (PDF, 308 KB, 9 pages)

Published 23 January 2013
Last updated 123 JulyMay 2024 + show all updates
  1. Addition of DP revisions to website

  2. Approved Close Out Report added

  3. Approved Decommissioning Programme

  4. Approved DP added

  5. New Decommissioning Programme added to website

  6. A DP has been approved

  7. Change of Operator has occurred in the Wenlock and Garrow Fields

  8. Consultation DP added

  9. Close Out Report added to Website

  10. Approved DP added

  11. Decommissioning Programme for consultation

  12. The Brae Bravo Topsides Close Out Report has been accepted and added to the website.

  13. Acceptance of Close Out Report

  14. Approved Decommissioning Programme

  15. Helvellyn - Waldorf has been moved from "under consideration" to "approved".

  16. Garrow documents added for Public Consultation.

  17. Final draft of Financial Assurance Guidance published

  18. Decommissioning Programme approved

  19. Decommissioning Programme approved

  20. Approved Decommissioning Programme

  21. A DP has been approved

  22. A DP has been approved

  23. Decommissioning Programme for consultation

  24. New DP out to consultation.

  25. ODU email address updated

  26. Decommissioning Programme out to consultation

  27. Consultation DP added

  28. Typo corrected on IPR 1

  29. Addition of new IPR forms for use

  30. Consultation DP added

  31. Consultation DP added

  32. DP approval

  33. Decommissioning Programme for consultation

  34. Decommissioning Programme for consultation

  35. East Brae UJ DP consultation commenced

  36. Consultation decommissioning programmes added

  37. DP approval

  38. Addition of Western Isles FPSO DP in programme under consideration tab

  39. Close Out Report added

  40. link to guidance update page

  41. Consultation DP added

  42. DPs withdrawn as added in error

  43. Consultation DPs added

  44. DP approval

  45. DP approval

  46. DP approved

  47. DPs have now been approved

  48. lancaster FPSO DP approved

  49. DP approval

  50. Consultation draft DP added

  51. Consultation draft DPs added

  52. Decommissioning Programme for consultation

  53. N11 COR added

  54. Notification of an approved DP

  55. DP approval

  56. Approved DPs published

  57. Brae B upper jacket DP approved

  58. Approved DP

  59. approval of foinaven FPSO DP

  60. response to consultation document for proposed changes to fee charging regime in respect of offshore oil and gas installations and pipelines published

  61. DP Approval

  62. Consultation DPs added

  63. Decommissioning programme for consultation

  64. Approval of Decommissioning Programme

  65. New DPs out to consultation

  66. wenlock DP approval re-added appears to have been deleted in error

  67. Consultation DP

  68. Approved DP

  69. Approved DP

  70. DP approval

  71. Draft programme for consultation

  72. DP approval

  73. Consultation DP added

  74. DP approved

  75. Causeway and Fionn DP consultation

  76. DP approval

  77. Decommissioning Programme for consultation

  78. Decommissioning Programmes added for Public Consultation

  79. Acceptance of Close Out Report

  80. DP Consultation

  81. COR accepted

  82. Consultation DP added

  83. ensign DP approved

  84. Consultation DP

  85. markham close out report added

  86. Consultation DP

  87. DP approval

  88. Cost recovery consultation impact assessment added

  89. DP Approval

  90. DP approval

  91. newly approved DP

  92. Decommissioning programme for consultation

  93. Consultation draft DP added

  94. Edited 'Overview' section to publish details of consultation on proposed changes to fee charging regime.

  95. interim CORs added for Banff FPSO and SAL buoy DPS

  96. approval of Gaupe DP

  97. Approval of Decommissioning Programme

  98. DP approved

  99. Adding an approved DP

  100. Consultation DP

  101. DP approved

  102. Approved Decommissioning Programme

  103. Decommissioning Programmes for consultation

  104. DP approved

  105. DP approved

  106. DP approved

  107. COR added

  108. Approved DPs added

  109. Close Out Reports Approved

  110. Adding A Decommissioning Programme which is out to Public Consultation.

  111. Consultation DPs added

  112. Consultation DP added

  113. Consultation DP added

  114. Approval of Decommissioning Programme

  115. Decommissioning Programme Approved

  116. Approval of preparatory works

  117. Consultation DP added

  118. Accepted Close Out Report added

  119. Approval of Decommissioning Programme

  120. Five new DPs out to consultation

  121. A new DP is out to public consultation

  122. draft DP added

  123. Decommissioning Programmes for consultation

  124. Approval of A DP and Derogation

  125. Draft decommissioning programme for consultation

  126. Decommissioning Programme for consultation

  127. document replaced with updated version

  128. Decommissioning Programme Approval

  129. Approved Decommissioning Programme

  130. Consultation DP added

  131. DP has been approved

  132. Decommissioning Programme for consultation

  133. A DP has been added for public consultation

  134. Approval of Decommissioning Programme

  135. Approved DP added

  136. Approval of Decommissioning Programme

  137. approval of Eider topsides DP

  138. A Decommissioning Programme has been approved

  139. consultation DP added

  140. Approval of a DP

  141. Approved DP

  142. Approval of a DP

  143. Decommissioning Programme for consultation

  144. Approved DP

  145. Decommissioning Programme now approved

  146. Consultation DPs

  147. Decommissioning Programme for consultation

  148. CoR added to website

  149. DP approval

  150. Huntington Consultation DP added

  151. New Decommissioning Programmes out to consultation.

  152. New DP out to consultation

  153. New DP out to consultation

  154. Decommissioning Programmes for consultation

  155. Decommissioning Programme for consultation

  156. Decommissioning Programme for consultation

  157. Approved of Banff SAL Buoy DP

  158. Consultation of Cavendish Decommissioning Programme

  159. MacCulloch DP approved

  160. New approved DP

  161. Consultation of Ensign

  162. Approval of Decommissioning Programme

  163. Approval of South Morecambe DP3/DP4 Decommissioning Programmes

  164. Pickerill installations DP approved

  165. Minke DP approved

  166. Banff SAL buoy DP for consultation

  167. Addition of two approved decommissioning programmes

  168. Added the approved Juliet DP to the website

  169. PL5 approved

  170. NNP approved

  171. Decommissioning Programme for consultation

  172. Consultation of MacCulloch Field Decommissioning Programmes

  173. Revised CAs for Brae A, Brae B and East Brae

  174. Approval of Nevis N11 WHPS Decommissioning Programme

  175. Change of email to a generic one rather than a personal email.

  176. Schiehallion & Loyal Phase One Close Out Report Approved

  177. Approval of the Dunlin Alpha Topsides Decommissioning Programme

  178. Update of the content of the DP

  179. Approval of Hewett Vent Stack DP

  180. consultation closed

  181. Consultation DP and supporting documents for PL5

  182. Minke and Juliet consultation DPs published

  183. Addition of Close Out Report

  184. New Approved Programme

  185. New programme for consultation

  186. Publishing approved Curlew DP

  187. Morecambe DPs published for consultation

  188. Added a CoR

  189. Addition of Close Out Report

  190. Approved DPs for VDP2 and VDP3 added

  191. Addition of approved DPs for Tyne South Installations and Guinevere Installation

  192. Addition of approved decommissioning programme

  193. Approval of a Decommissioning Programme

  194. Addition of Brent Delta Close Out Report

  195. Addition of 2 decommissioning programmes for consultation

  196. Update decommissioning templates added

  197. Guidance document was updated and uploaded

  198. Adding Goldeneye DP for consultation.

  199. Jacky Decommissioning Programmes Approved

  200. Approval of Close out Report

  201. Approval of Decommissioning Programme

  202. VDP2 and VDP3 consultation draft Decommissioning Programmes added

  203. Approval of Brent Alpha, Bravo and Charlie Topsides Decommissioning Programme

  204. Offshore Oil and Gas Decommissioning Programme out to consultation

  205. Addition of a new decommissioning programme for consultation

  206. Tyne South and Guinevere Installation Decommissioning Programmes published for consultation

  207. Addition of Curlew DPs, CA and EIA for Public Consultation.

  208. Decommissioning Programme Approved

  209. Updated Offshore decommissioning guidance has been added

  210. Ann & Alison, Saturn (Annabel) and Audrey DPs have been approved

  211. Changed document to final version

  212. A decommissioning programme has been approved

  213. Approved Markham DP

  214. Bains Documents Added

  215. Updated Environmental Guidance on Decommissioning

  216. Jacky DP Consultation

  217. Draft Consultation Decommissioning Programme uploaded

  218. Updated guidance for Offshore Decommissioning on website for feedback

  219. Addition of approved DPs

  220. Approved DPs added

  221. Saturn Annabel, Audrey and LDP1 Programmes for public consultation

  222. DPN form corrected

  223. generic email address added and DPN form updated (with generic email address)

  224. Ann and Alison DP's and associated documents added for public consultation

  225. Fairfield Fagus Limited's Dunlin Fuel Gas Import and Power Import, Merlin and Osprey Decommissioning Documents uploaded

  226. Brae Area DPs and associated documents available for consultation

  227. Harding STL Close Out Report added

  228. Disused Pipeline Notification Form revised - 03 May 17

  229. Leman BH Decommissioning Programme approved

  230. Approval of Ettrick and Blackbird DP

  231. Ninian North Platform documents published for public consultation A4 Programme approved

  232. Brent Decommissioning Programmes published for consultation

  233. IVRR Close Out Report added

  234. Ann A4 Installation Decommissioning Programme added for consultation

  235. Approved Decommissioning Programmes added

  236. Atlantic and Cromarty Draft Decommissioning Programmes Consultation

  237. references of DECC amended to BEIS (including DPN form)

  238. Janice, James & Affleck Fields - Draft programmes under consideration (added)

  239. Markham ST-1 Decommissioning Programmes - (added)

  240. Oil & Gas: Update Notification of Disused Pipelines

  241. Oil & Gas: Update Table of draft decommissioning programmes under consideration.

  242. Leadon Decommissioning Programmes - (added)

  243. Notification of Disused Pipelines form - (updated)

  244. Harding STL approved decommissioning programme - (added)

  245. Thames Area - Horne & Wren, Orwell and Wissey approved decommissioning programmes - (added)

  246. Fife, Flora, Fergus, Angus: decommissioning programme FFFA Close Out Report - (added)

  247. Thames Area – Thames Complex, Gawain & Arthur - Approved decommissioning programmes - (added)

  248. Viking Satellites CD,DD,ED,GD,HD draft decommissioning programmes under consideration - (added)

  249. Oil and Gas: Updated document for Harding STL Decommissioning Programme

  250. Oil and Gas: Updated “Table of approved decommissioning programmes” table.

  251. Leman BH draft decommissioning programme - (added)

  252. Oil and Gas: Addition of Brent field to approved decommissioning programme

  253. Oil and gas: Rose approved decommissioning programme - (added)

  254. Decommissioning - Leadon draft programme, follow up consultation - (added)

  255. Oil and gas: Stamford decommissioning programme - (added)

  256. Oil and gas: Rose Field decommissioning programmes - (added)

  257. Oil and gas: Brent – Brent Delta Topside draft decommissioning programme - (added)

  258. Oil and Gas: Addition of Stamford Field to decommissioning programmes table

  259. Oil and Gas: Updated the disused pipeline notification form

  260. Oil and gas: Decommissioning - Streamlined Decommissioning Programme Template (Derogation Cases) - (added)

  261. Oil and gas: NW Hutton close out report - (added)

  262. Oil and gas: Decommissioning draft prgrams - Thames - (added)

  263. Oil and gas: Indefatigable (Shell) close out report - (added)

  264. Oil and gas: Streamlined Decommissioning Programme Template (Non-Derogation Cases) - (updated)

  265. Oil and gas: Murchison approved decommissioning programme - (added)

  266. Oil and gas: Rubie & Renee - Approved decommissioning programme - (added)

  267. Oil and gas: Decommisiioning Linhe close out report - (added)

  268. Oil and gas: Streamlined Decommissioning Programme Template (Non Derogation Cases) - updated

  269. Oil and gas: Leadon Draft Decommissioning Programme - added

  270. Oil and gas: Miller decommissioning programme - (added)

  271. Oil and gas: Rubie/Renee Draft Decommissioning Programme - (added)

  272. Camelot close out report - added

  273. Added Murchison draft decommissioning programme

  274. Added streamlined decommissioning programme template

  275. Re-created table, added H2's and anchors

  276. First published.