RP4: Livestock and machinery hardcore tracks
Find out about eligibility and requirements for the livestock and machinery hardcore tracks item.
- From:
-
- Published
- 2 April 2015
- Last updated
-
3
10FebruaryOctober20252023— See all updates
- Grant type:
-
- Capital item
- Land use:
- Land use:
-
,and Water quality - Tiers or standalone items:
- Tiers or standalone items:
-
,and Standalone capital items - Funding (per unit per year):
- Funding (per unit per year):
-
- Up to £100
- Grant type:
This item is part of Capital Grants. You must read the Capital items: guidance for applicants and agreement holders to understand the rules and how to apply.
How much you’llwill be paid paid
£44.63 per metre (m).
HowWhere thisto itemuse benefitsthis the environmentitem
NewIt farmis tracksavailable reducefor soilCountryside compactionStewardship andMid erosionTier, causedHigher byTier livestock and machinery.Capital TheyGrants helpin reduceone channelling of surfacethe runofffollowing:
withand the risksupportof sedimentCatchmentandSensitiveotherFarmingpollutants(CSF)inenteringcombinationawithwatercourse.This
optionsitemforcanthehelpmanagementyouandprotect,restorationrecoverofandhabitatsimproveorbiodiversityfeaturesonwithyourtheland.Where
supportyouofcanauseNaturalthisEnglanditemadviser
You
Where can only use this item either:cannot be used
- with
TotherepairsupportpotholesoforCatchmentupgradeSensitiveexistingFarming - in
constructedcombinationtrackswithandactionsfarmordrives,optionsthatforhavetoacreate,man-maderestoresurface Onhistoricarchaeologicalhabitatsfeaturesor featuresareaswith the support of aexistingNaturalwildlifeEnglandinterestadviser
Catchmentidentified Sensitiveon Farmingthe providesFarm adviceEnvironment whereRecord there(FER), arethe waterEnvironmental qualityInformation Map or floodthe riskHistoric issuesEnvironment linkedFarm toEnvironmental farming.
You’llRecord need(HEFER)
You
How cannot use this item:
- to
item repairwill potholesbenefit orthe upgradeenvironment
New existingfarm constructed tracks andreduce farmsoil drivescompaction thatand haveerosion acaused manufacturedby surface
Requirements
You Recordmust:
make(FER)sureoralloncapitalMAGIC
Whatworks youmeet mustthe dorelevant toBritish useStandards this- item
Youexamine mustcopies completeof the worksmost followingup-to-date thisstandards advice.
InstallingHardcore hardcore tracks
You must:
- excavate
Excavatea trench at least 2.4m wide and at least 150 millimetres (mm) deep, or down to a naturally occurring hard surface - profile
Profilethe edge of the track with the excavated soil - overlay
Overlaythe area with a geotextile membrane if the base of the trench lies on subsoil –(aa geotextile membrane is not needed if the base is bedrock or chalkchalk) - fill
Fillthe excavatedtrencharea with aggregatestone(hardcore)orhardcore150mm,and then compact it - finish
Finishthe top of the track with a finer material (of 18mm to dust) to a depth of 25mm25to 50mm50mm,–andcompact it into a convex camber (like a dome shape) - direct
Directany track runoff to a ditch or other stable drainage outlet, or divert it on to grassland
InstallingHardcore hardcore tracks using concrete sleepers
You
Excavatemust excavate a trench following the instructions above and layinaddition:Invert- inverted
sleepersand solaythethemtopslightlyproud Laythesleepersandbuttthemup
- inverted
Installing
Hardcorehardcore tracks on peaty soilsYou must:
- excavate
Excavatea trench 2.4m wide and at least 300mm deepdeep,(oror500mm on deep peats)peats - dig
Digout soft pockets in the profile, drain them, fill them with well compacted hardcore and cap them with clay - lay
Laya geotextile membrane to the full width of the track, folding up the sides of the trench - lay
Laythe membrane in the trench on to a surface that will not puncture the material - allow
Allowat least 300mm for any sheetsoverlapof membranetheto overlapmembrane - fill
Fillthe trench to within 50mm of the top with stone or hardcore (from 40mm to dust) - profile
Profileand compact the track to produce a convex camber - top
Topoff the track with a wearing course (18mm to dust) to a depth of 25mm25to 50mm50mm,and compact it to produce a convex camber - make
Makesure the geotextile membrane is fully covered – if necessary,necessaryyougrassmustturfusemaygrassbeturfusedto prevent exposure of the membrane at the edge of the track
You
Domust notnot:- use general, ungraded building rubble.
rubble
Evidence
Keepingyou must keeprecordsYou
WheremustyoukeeparewrittenusingsupportthisfromitemyouronCatchmentaSensitivepublicFarmingrightofway,consultthelocalhighwaysauthority(LHA)beforeyouapplytogetanyadviceconsentEnglandwhichadviseryouandneed.provideYouitdonotneedtosendthisapplication,butyouwillneedtosendanyconsentswithyourpaymentclaim.You must also
sendthefollowingwithyourapplication:writtensupportfromCSForNaturalEnglandadviser
Youmustthefollowingrecordssupplythempayment- photographs of the site during the different stages of construction or contracts, invoices or other documents confirming the technical specification for the completed works
- photographs of the completed work
worksinplaceandinstalled - any consents or permissions
connected(LHA)
You must also keep
thefollowingrecordssupplythem- any consents or permissions connected with the work (in addition to the ones provided
statedwith your claim)above) - receipted invoices
invoices,or bank statements where a receipted invoice is unavailable - photographs of
orthe site before works start
Read
RelatedtheMidrecordTierkeeping and site visit requirements in the Agreement holder’s guide: Capital Grants,GrantsHigher Tier capital grants and Protection and Infrastructure grants for more information.Other items you can use with this item
You can use this item with
onthesetheitems:RP6:
asInstallationtheofRP5piped-culvertsCrossin ditchesdrainsitem.Advice to
andhelpsuggestionsyouforusehowtocarryoutThe following advice may
ishelphelpful,you to use this item, but youtheydoarenot haverequirementstoforfollow it to get paid. It’s not part of this item’s requirements.item.British
HowStandardsCheck to make
choosesure the works meet relevant British Standards.Choosing a location
It’s
Itis- construct the tracks alongside field boundaries rather than across the middle of the field –
-this will help preserve the appearance of the landscape - avoid placing the tracks where they’ll
theywill - camber the tracks so there’s
waternoshedsstandingcontinuouslywateroffthem - use cross drains or bunds if you
thetracksbethe trackscambered - use cross drains
drains,(Ififnecessary)necessary,on sloping tracks or tracks that lead on to a highway
When to add a geotextile membrane
You do not need to use a geotextile membrane for all types of soil. It’s
ItisTracks used by machinery may need a geotextile membrane and base layer of stone
stone,depending on the type of soil. Concrete sleepers alone are not adequate for machinery tracks.Maintaining
HowtomaintainYou should replace and compact any material lost to potholes and erosion. You should keep the track dry and firm and deal with any problems as soon as they appear.
PermanentineligiblefeaturesConstructedfarmtracksmaybeclassedaspermanentineligiblefeaturesandexcludedfromareapaymentschemes.BiodiversityThisitemhasbeenidentifiedasbeingbeneficialforbiodiversity.AllCountrysideStewardshiphabitatcreation,restorationandmanagementoptionsareofgreatsignificanceforbiodiversityrecovery,asarethewiderangeofarableoptionsinthescheme.Capitalitemsandsupplementscansupportthishabitatworkdependingontheholding’ssituationandpotential.Theconnectivityofhabitatsisalsoveryimportantandhabitatoptionsshouldbelinkedwhereverpossible.Betterconnectivitywillallowwildlifetomove/colonisefreelytoaccesswater,food,shelterandbreedinghabitat,andwillallownaturalcommunitiesofbothanimalsandplantstoadaptinresponsetoenvironmentalandclimatechange.FurtherinformationCatchmentSensitiveFarming(CSF)providesfarmerswithfreeadviceandtrainingtoimprovewaterandairqualityandreducefloodrisk.SeeguidanceforfurtherinformationonCSFsupport.ReadCountrysideStewardship:getfundingtoprotectandimprovethelandyoumanagetofindoutmoreinformationaboutMidTier,HigherTierandCapitalGrantsincludinghowtoapply.
Updates to this page
Published 2 April 2015Last updated 3
-
General improvement for clarity.
-
Change to sentence to read - to repair potholes or upgrade existing constructed tracks and farm drives, that have a man-made surface
-
The Where to use this item, Where this item cannot be used, Hardcore tracks using concrete sleepers, Keeping records sections of this page have been updated
-
Added in links to Capital Grants manual as this option is now available for Capital Grants
-
The Keeping records section of this page has been updated
-
Updated for 2017 applications.
-
Updated for second year applications (2016).
-
First published.
Explore the topic
Update history
2025-02-03 13:46
General improvement for clarity.
2023-10-10 14:33
Change to sentence to read – to repair potholes or upgrade existing constructed tracks and farm drives, that have a man-made surface
2023-01-05 12:25
The Where to use this item, Where this item cannot be used, Hardcore tracks using concrete sleepers, Keeping records sections of this page have been updated