SR2022 No 3: construction, demolition and excavation waste transfer station
Standard rules for a waste transfer station accepting construction, demolition and excavation waste.
Applies to England
Documents
Details
This standard rules permit allows you to operate a construction, demolition and excavation waste transfer station.
You can apply for this standard rules permit if:if:
your activity meets the rules set out in the permit
permityou can manage the potential risks as set out in the generic risk assessment
assessment
Charges
The charges for applying for this standard rules permit are:
£2,641 for a new standard rules permit application
£792 for a minor variation to the permit
£2,529 to transfer the permit
£1,585 to surrender the permit
There is also an annual subsistence charge of £1,920 for the standard rules permit.permit.
Apply
You onlinecan get advice before you apply for a permit.
How to apply for an environmental permit.
TheThis Environmentpermit Agencyreplaces:
SR2008isNotesting10a75kteinertandexcavationwastetransferstationSR2009No5inertandexcavationwastetransferstationbelow250kte
If you cannot comply with the new onlinestandard servicerules forpermit you will need to apply to vary your permit into applicationsa inbespoke England.permit. You can signmust upusually toapply usewithin 3 months of the date the standard rules was published (18 December 2024). We have extended this to 27 June 2025. Extension to comply with new servicestandard andrules givepermits feedbackRPS 331..
Updates to this page
-
Added that the Environment Agency is testing a new online service for permit applications in England. Added a link so you can sign up to use the new service and give feedback.
-
18 December 2024 First published.
Update history
2025-11-06 16:30
Added that the Environment Agency is testing a new online service for permit applications in England. Added a link so you can sign up to use the new service and give feedback.
2025-04-28 13:10
Added a link to ‘Extension to comply with new standard rules permits: RPS 331’ – this regulatory position statement has extended the deadline for complying or applying for a permit for existing permit holders.
2024-12-18 17:53
First published.