Guidance

Specified generator: apply for an environmental permit

The types of permit available, how much they cost and how to apply for your environmental permit.

Applies to England and Wales

Update history

2026-02-12 10:00
Added links to a new service for applying for a environmental permit online in England.

2026-01-09 15:00
Updated the guidance to allow the use of the Simple Calculation of Atmospheric Impact Limits (SCAIL) Combustion tool to screen specified generators.

2025-01-20 09:00
Added that the Environment Agency is testing a new online service for medium combustion plant and specified generator permit applications in England. Added a link so you can sign up to use the new service and give feedback.

2024-07-22 16:46
Added that Natural Resources Wales do not issue standard rules permits anymore – only bespoke permits. If your specified generator is in Wales, use the Natural Resources Wales guidance. Updated the ‘After you apply’ section to clarify what happens if the regulators need more information before an application can be ‘duly made’.

2023-03-27 09:00
‘Charges for standard rules permits’: added about charges where the plant is also a new MCP. ‘Air emissions risk assessment’: added the specified generator tool can also be used for tranche A specified generators. ‘ELV compliance verification’: added more guidance on which monitoring methods should be used for different types of permits for specified generators.

2023-03-07 10:53
Updated reference to ‘Monitoring stack emissions’ and contact email address for issues with the standard rules permit form. Clarified types of bespoke permit available and the air emissions risk assessment required. Added text to the section ‘energy efficiency report of SG 20MWth or more’ – ‘and produces waste heat at a useful temperature’.

2023-01-04 14:57
Removed the link to the online application services as people must use the application forms to apply for a bespoke specified generator permit.