This item is part of Capital Grants.Grants 2025. You must read the Capital items:Grants 2025 guidanceforto applicantsunderstand the rules and agreementhow holdersto apply.
If you’re applying for this item as part of a Countryside Stewardship Higher Tier (CSHT) application, you must read the CSHT applicant’s guide to understand the rules and how to apply.
How much you’ll be paid
£7.52 per square metre (m2).
How this item benefits the environment
A swale (channel) collects surface runoff water from fields, tracks or yards allowing sediment to settle to the bottom and water to enter the ground.
This item helps to reduce runoff and the risk of soil erosion and water pollution. Swales can also slow water flows during heavy rainfall and reduce downstream flooding and support water resources.
This item can help you protect, recover and improve biodiversity on your land.
Where you can use this item
You can use this item either:
in areas targeted to reduce water pollution from agriculture
to reduce flood risk
to improve recharge of groundwater – where permeable soils and geology allow for the capture and storage of groundwater
You may need a feasibility study, implementation plan or a Catchment Sensitive Farming water holding structure action plan developed with Natural England.
Catchment Sensitive Farming provides advice where there are water quality or flood risk issues linked to farming.
You’ll need to get relevant advice, permits or consents from the Environment Agency, local council, lead local flood authority or internal drainage board before you start any work.
You must also contact your local planning authority to check if planning permission is needed.
You cannot use this item:
to collect effluents, slurries or other organic manures
on areas of wildlife interest identified on your Farm Environment Record (FER) or on MAGIC
What you must do to use this item
You must either follow the requirements set out in your feasibility study or the Catchment Sensitive Farming water holding structure action plan developed with Natural England to:
construct a channel along a contour or on a slope gradient of no more than 2 degrees
mark the layout of the swale on the ground
excavate the swale bed to a depth of 750 millimetres (mm)
stockpile the topsoil separately to use on the bed and side slopes of the swale
construct the side slopes with a gradient of no more than 1 in 3
excavate a further 150mm to 250mm and place the topsoil on the bed
establish a dense grass sward on the bed and sides of the swale
If you’re applying for this item as part of a Countryside Stewardship Higher Tier (CSHT) application, read the record keeping and site visit requirements in the CSHT agreement holder’s guide.
The following advice may help you to use this item, but you do not have to follow it to get paid. It’s not part of this item’s requirements.
Using this item with other measures
Use this item with other farm measures to reduce surface runoff and water pollution. Good soil management will encourage the filtration of surface water and minimise runoff.
Using check dams or silt barriers
You can use capital items such as check dams or silt filtration barriers in swales to help slow water flow, reduce sedimentation and encourage infiltration.
How to establish a grass sward
To establish a dense grass sward, sow a seed mixture at a seed rate of 25g per m2 (for the best results). The mixture may be a multi-species grass mix such as creeping red fescue (70%), smooth meadowgrass (20%) and creeping bent (10%).
Amended item - you can now use this item:
- to reduce flood risk
- in catchments where permeable soils and geology allow for the recharge of groundwater
31 January 2021
Added in links to Capital Grants manual as this option is now available for Capital Grants