OpenConsultation consultationoutcome

Proposed refinements for Allocation Round 8 and future rounds

Applies to England, Scotland and Wales

This consultation has concluded

Read the full outcome

Detail of outcome

Government response to legislative proposals on proposed refinements for Allocation Round 8 and future rounds

This document sets out the government’s response to the proposals in Chapter 5 of the consultation published on 16 December 2025.

We will publish a separate government response setting out our decisions on the other measures proposed in the consultation.

Following the consultation, we will amend the Contracts for Difference (Allocation) Regulations 2014 to allow NESO to correct certain types of delivery body errors and to consider new documentary evidence or information when examining ‘Tier 1’ appeals in respect of non-qualifying applications.  

The Allocation Regulations are also being amended to clarify the treatment of pending applications in light of operational experience from Allocation Round 7 (AR7) held in 2025.  

Detail of feedback received

We received 79 responses to this part of the consultation, with the majority coming from industry (trade associations, renewables developers and supply chain companies) and a small number from public bodies, investors and individuals.

The overall stakeholder response was very positive, with high levels of support for several proposals.


Original consultation

Summary

We're seeking views on several refinements to ensure that the CfD continues to reflect current policy and that the scheme continues to function as originally intended.

This consultation closesran atfrom
to

Consultation description

This consultation seeks views on proposed refinements to the Contracts for Difference (CfD) contract terms in advance of Allocation Round 8 (AR8). The proposals in this consultation cover a range of areas, including:

  • policy on surrendered CfD capacity – making permanent the restriction on bidding previously surrendered capacity into future rounds to protect auction integrity and deployment timelines
  • hybrid metering for single technology/multipletechnology/ multiple commercial arrangements – enabling CfD and merchant assets of the same technology to share metering infrastructure, reducing costs
  • contractual changes for floating offshore wind (FLOW) – extending the Longstop Period and reducing the Required Installed Capacity threshold to reflect the scale and complexity of future projects
  • introducing a new technology category for Other Deepwater Offshore Wind (ODOW) – enabling innovative foundation designs for deepwater sites to compete for CfD support
  • changes to improve scheme efficiency – proposed legislative amendments to allow the National Energy System Operator (NESO) to correct errors made during the assessment of CfD applications and consider new documentary evidence to clarify non-material errors and omissions in applications, and minor adjustments to improve administration of the pending applications process
  • strengthening Unilateral Commercial Operations Notice (UCON) provisions – improving metering access and enforcement to prevent distribution-connected generators from delaying CfD start dates and operating on a merchant basis at elevated wholesale prices
  • excluding applications with Gate 1 connection offers – aligning CfD eligibility with grid connection reforms to prioritise projects with firm connection dates
  • visibility of sealed bids – changing our approach on the ability of the Secretary of State to see bids for AR8
  • minor and Technicaltechnical changes to the CfD contract terms to update the CPI inflation factor and amend the definition of Inside Information
  • in addition, to provide a policy update on fixing the appeals timeline

Together, these reforms are designed to maintain investor confidence, support timely delivery of renewable capacity, and ensure the CfD remains fit for purpose as projects scale up in size and complexity.

The proposed drafting changes are shown as tracked amendments in the CfD contract documents, published alongside the consultation document. We welcome responses from anyone with an interest in the proposals, in particular those considering participating in AR8.

Read our consultation privacy notice.

Documents

DRAFT: Contracts for Difference Allocation Round 8 (Phase 1): Agreement (Apportioned)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRAFT: Contracts for Difference Allocation Round 8: Agreement (Generic)

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

DRAFT: Contracts for Difference Allocation Round 8: Standard Terms and Conditions

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email alt.formats@energysecurity.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Ways to respond

Updates to this page

Published 16 December 2025
Last updated 20 March 2026 href="#full-history">+ show all updates
  1. Published the first part of the government response for this consultation.

  2. First published.