Statutory guidance

SR2024 No 2: using unbound incinerator bottom ash aggregate in construction

Standard rules for unbound incinerator bottom ash aggregate (IBAA) in construction as a deposit for recovery operation.

Applies to England

Documents

Details

These standard rules will allow you to store and subsequently use unbound incinerator bottom ash aggregate (IBAA) for the purposes of a recovery activity involving the deposit of waste in the following construction activities:

  • building a road sub-base
  • building a structural platform
  • pipe bedding

You can apply for this standard rules permit if: 

  • your activity meets the rules set out in the permit 
  • you can manage the potential risks as set out in the generic risk assessment

The charges for applying for this standard rules permit are:

  • £2,741.36 for a new standard rules permit application
  • £822.10 for a minor variation to the permit
  • £2,625.10 to transfer the permit
  • £1,645.23 to surrender the permit

There is also an annual subsistence charge of £3,442.28 for the standard rules permit.

You can get advice before you apply for a permit

HowCheck how to apply for an environmental permit.

Updates to this page

Published 20 May 2026
Last updated 20 May 2026 href="#full-history">+ show all updates
  1. Added the charges for this permit into the 'Details' section.

  2. First published.