How much you’ll be paid
£3.31 per metre (m).
How this item benefits the environment
Providing livestock with an alternative to drinking from watercourses reduces bank erosion, sediment pollution and the faecal contamination of watercourses.
Where you can use this item
You can use this item either:
in areas targeted for the reduction of water pollution caused by farming, where livestock are excluded from stream or surface waters
where a new trough is needed to meet the grazing requirements of a creation or management action or option
You cannot use this item:
to replace existing equipment in the same location
under housing or roof structures
within 10m of watercourses
on areas vulnerable to soil erosion as identified on your Farm Environment Record
use pipework made of medium-density blue polyethylene with an external diameter of at least 25 millimetres (mm)
make sure that all the joints are watertight and made of brass or plastic
bury the pipework below cultivation depth and to at least 600mm (or as determined by the local water supplier)
cover the pipe with a tubular steel guard or sleeve pipe if it crosses an open ditch
lay the pipe 600mm below the ditch to allow for ditch cleaning
lay the pipe on a 75mm bed of sand if it crosses farm tracks and then cover it with a further 100mm of sand, before overlaying it with backfill
Evidence you must keep
You must keep and provide with your claim:
photographs of the site during the different stages of construction or contracts, invoices or other documents confirming the technical specification for the completed works
photographs of the completed works in place and installed
You must also keep and provide on request:
any consents or permissions connected with the work
receipted invoices or bank statements where a receipted invoice is unavailable
If you’re applying for this item as part of a Countryside Stewardship Higher Tier (CSHT) application, read the record keeping and site visit requirements in the CSHT agreement holder’s guide.
Removal of text confirming LV8 Pipework associated with livestock troughs availability under Countryside Stewardship Capital Grants (SFI pilot), as the SFI Capital offer is no longer available.
1 February 2022
'Where to use this item' section updated to include detail on SFI pilot.
31 January 2021
Added in links to Capital Grants manual as this option is now available for Capital Grants