Detail of outcome
Following the consultation, the responses have all been considered and the standard rules set has been updated to add clarity to address many of the relevant concerns. See SR2008 No 9: storage of asbestos waste.
Original consultation
Summary
We want your views on our proposal for a revised standard rules permit for storage of asbestos waste to improve the design and operation of permitted facilities in the asbestos waste sector.
This consultation iswas being held on another website.
This consultation closesran atfrom
to
Consultation description
This consultation is to seek your views on the proposed revised SR2008 No 9 storage of asbestos waste.
New measures in the revised permit include the following requirements.
You must not:
- transfer asbestos between different bulk containers
- store asbestos loose or in bays
- store asbestos on site for more than 6 months
- stack bulk containers
- use mechanical equipment, for example loading shovels, chutes and conveyors to move asbestos waste
A new condition (3.1.1) will be added about point source emissions to water, air or land, previously covered in the introductory note.
We will also seek your views on the generic risk assessments associated with each standard rule set.
The consultation document explains:
- what we are consulting on
- what the consultation means to you
- the standard permitting process
- the proposed revised new standard rules permits
- how we will gain your consent and use your information
- how you can respond to the consultation
- the principles we follow when running this and other consultations
Your response will help us understand:
- whether the revised standard rules permit ensures that the environmental risks posed by this activity are reduced to an acceptable level
- the positive and negative impacts this could have on businesses
Share this page
The following links open in a new tab
Updates to this page
-
Added the consultation response.
-
Fixed the link to the consultation page on Citizen Space.
Sign up for emails or print this page
Update history
2026-07-21 09:50
Added the consultation response.
2025-09-30 13:53
Fixed the link to the consultation page on Citizen Space.
2025-09-29 09:00
First published.