Local Authority Treescapes Fund claim forms and guidance
If you're an existing Local Authority Treescapes Fund (LATF) grant holder, use these forms and guidance to submit a claim. The LATF is closed for applications.
Applies to England
Documents
Details
The Local Authority Treescapes Fund (LATF) is closed.
Submit an LATF claim
CompleteRead the claims guidance for existing grant holders before completing the relevant forms for each claim.
For pre-planting claims submit the following forms:
- LATF pre-planting claim form
LATFsigned non-RDPEpost-plantingclaimsreportdeclarationandform
For claim,post-planting claims, read the post-planting report guide
and submit the following forms:
-
LATF
maintenancePPR claim form(annuallyfor3yearsfollowingeachyearofplanting),seemoreonfinalmaintenanceclaims asigned non-RDPE claims declaration form(forallclaims)
EmailFor completedmaintenance LATFclaims, forms,read supporting evidence, and the declarationbeat formup to LATF@forestrycommission.gov.uksurvey guidance.
Claims deadlinesand 2024submit tothe 2025
following:
Round 4 deadlines
-
Pre-plantingLATF maintenance claim1declarationshouldform - a
bebeat-upsubmittedsurveyuponforreceipttheoffinalamaintenanceformalyearLATF(years‘offer4ofandfunding’5andifmustyoubehavesubmitteda 2beforeyear agreement)midnightread more on31finalMarchmaintenance2025.claims
Post-planting
Planting claim 2deadlines mustfor bethe submittedfinancial once year 12025-26 (Round planting4 isonly)
Submit completepre-planting andclaim 3 (approved deferrals only) before midnight on 31 March 2025.2026.
Round
Submit 3post-planting yearclaim 24 planting(approved deadlines
Pre-plantingdeferrals claimonly) 3before shouldmidnight beon submitted31 afterMarch 12026, April 2024 and mustonce beyear submitted2 beforeplanting midnightis on 31 March 2025. complete.
Post-planting claim 4
Post-plantingClaims claimwill 4not must be submittedpaid beforeif midnightthey onare 31submitted Marchafter 2025. the deadline.
Maintenance claims deadline
deadlines (all rounds)
MaintenanceYou claims (rounds 1 to 3) must besubmit submittedmaintenance claims between 1 October 20242025 and midnight on 31 March 20252026. (by midnight). We cannot accept maintenance claims submitted before 1 October of the financial year in which they are due.
Round
For 2025-26 1onwards finalyou maintenanceonly claims
Roundneed 1to finalcomplete and submit a ‘LATF maintenance claimsclaim (fordeclaration yearform’ 1(and trees)beat-up mustsurvey befor submittedfinal bymaintenance 31claims). MarchIf 2025.
Youyou needalready submitted the previous LATF tomaintenance sendclaim oneExcel ‘beat-upform surveyfor form’2025-26 with a declaration form, you do not need to resubmit your finalclaim.
Final maintenance claim.claims Readfor theRound beat-up1 surveyand guide2
The beforelead completing.local Youauthority should:
- complete the beat-up survey during the
20242025 growing season, and then plant any replacementsplantedneeded to ensure that the 75% survival rate is achieved in the winter planting season (and before the claim is submitted by 31 March) - submit one beat-up survey with your final maintenance
claimclaim, which includes all trees planted and claimed in your 2022-23 post-planting report
We can only accept one beat-up survey per final maintenance claim. This should be collated and submitted by the lead local authority.
You can also request a beat-up survey form from LATF@forestrycommission.gov.uk.
Claims due in 2024-252025-26 will not be paid if they are submitted after 31 March 2025.2026.
You must submit claims during the submission period. Read more about when you can apply.
Updates to this page
-
Added a new form: 'LATF maintenance claims declaration form'. Added latest information on 2025-26 claims information and deadlines. Edited the beat-up survey guidance with the latest deadlines. Added new post-planting report templates.
-
Updated LATF beat up survey form.
-
Added a new version of the LATF beat up survey form (v1.3).
-
Added a guidance page for existing grant holders. Added an updated beat-up survey form (new columns added under natural colonisation). Edited section 'Part 3: natural colonisation failure intervention' in the beat-up survey guidance.
-
Added a new version of the beat up survey form.
-
Added one updated version of the beat up survey spreadsheet. This replaced 2 versions (macro enabled and macro disabled versions).
-
An update to photo evidence requirements to align with UTCF. Smaller updates and improvements to pre-planting, post-planting and maintenance claim forms have also been made.
-
Edited the beat-up survey guide to reflect changes in submitting photos (now 10% of site). Small edits made to clarify that only one beat up survey is required.
-
The post-planting report (PPR) guide has been updated to clarify what is needed when sending supporting and photographic files.
-
Added LATF beat up survey guidance, and LATF beat up survey forms.
-
Added further information regarding claims deadlines 2024-25 and added a new maintenance claim form.
-
Added updated version of the guidance, and 2 new forms: Claims declaration form (non-RDPE) and LATF maintenance claim form.
-
Updated for new application round.
-
Local Authority Treescapes Fund round 3 is now open.
-
Page updated to reflect that the claims form is currently being revised. An updated form will be uploaded to the page in January 2022.
-
First published.