The 2020 EIA Regulations

The 2020 EIA Regulations

From 1st January 2021

Environmental Impact Assessments (EIA)

Projects listed in Schedule 1 of the 2020 EIA Regulations are subject to an EIA process as required by regulation 5(1). Projects listed in Schedule 2 are subject to a screening process to determine if an EIA is necessary, but the developer may wish to undertake an EIA as set out in regulation 5(2)(b), if they choose. To access further information on projects which are subject to the EIA process, please use the relevant link below.

Environmental Impact Assessments (EIA) - Transitional Cases

For projects where the Oil and Gas Authority decision on whether to grant consent is pending at the time when the 2020 EIA Regulations came into force, EIA’s are subject to the provisions of regulation 29 (Transitional and Saving Provisions relating to the 1999 Regulations). To access further information on EIA projects which are subject to the provisions of regulation 29, please use the relevant link below.

Screening Directions

Projects listed in Schedule 2 of the 2020 EIA Regulations require a screening direction in accordance with regulation 5(2)(a) to determine if an EIA is necessary. Screening directions for projects which have been through the screening process since 1st January 2021 can be accessed using the link below.

Deep Drilling Screening Directions

Pipeline Screening Directions

Production Screening Directions

Regulation 5(3) Decisions that No environmental impact assessment is needed without a screening direction

Schedule 3 Projects

The 2020 EIA Regulations provide that projects that fall under Schedule 3 do not require an EIA where the Secretary of State considers that the project is not likely to have a significant effect on the environment pursuant to regulation 7. Those projects are:

  • The construction of a pipeline for the transport of oil, combustible gas, or chemicals, or for the transport of carbon dioxide streams for the purposes of geological storage of carbon dioxide, or the maintenance, repair, replacement, protection or extension of an existing pipeline constructed for those purposes where no part of the pipeline or related works would extend more than 500 metres from a well or any part of an installation to which that pipeline would be directly or indirectly attached.

A list of Schedule 3 project decisions made since 1st January 2021 can be accessed at the following link:

Updates to this page

Published 5 January 2021
Last updated 2128 September 2026 — Show all updates
  1. Schedule 3 Projects Register updated

  2. Schedule 3 updated

  3. Schedule 3 Projects Register updated

  4. Schedule 3 Projects Register Updated

  5. updated Schedule 3 Spreadsheet

  6. Schedule 3 Projects Register Updated

  7. Schedule 3 Projects Register updated

  8. updated - Schedule_3_Projects_Register_-_10.08.2026

  9. Schedule 3 Projects Register updated

  10. Schedule 3 Projects Register

  11. Schedule 3 Projects Register updated

  12. Schedule 3 Projects Register updated

  13. Schedule 3 Projects Register updated

  14. Schedule 3 Projects Register updated

  15. Schedule 3 Projects Register - updated

  16. Schedule 3 Projects Register updated

  17. Updated schedule 3

  18. Schedule 3 Projects Register updated.

  19. Schedule 3 Projects Register updated

  20. Schedule 3 Projects Register updated

  21. Schedule 3 Projects Register Updated

  22. Schedule 3 - uploaded

  23. Schedule 3 document updated

  24. Schedule 3 Projects - updated

  25. Schedule 3 Projects Register updated

  26. Schedule 3 Projects Register Updated

  27. Schedule 3 Projects Register updated

  28. Schedule 3 Project Register Updated

  29. Schedule 3 Projects Register updated

  30. Schedule 3 Projects Register - updated

  31. Production Screening Directions – 2026

  32. Schedule 3 Projects Register updated.

  33. Updated Schedule 3 Project Register

  34. Schedule 3 Projects Register updated

  35. Schedule 3 Projects Register - updated

  36. Schedule 3 Projects Register updated.

  37. Addition of 2026 page to Pipeline Screening Directions

  38. Schedule 3 Projects Register updated

  39. Schedule 3 Projects Register updated

  40. Schedule 3 Projects Register Updated

  41. Addition of 2026

  42. Schedule 3 Projects Register updated

  43. Schedule 3 Projects Register updated

  44. Schedule 3 Projects Register - updated

  45. Schedule 3 Projects Register updated.

  46. Schedule 3 Projects Register updated.

  47. Schedule 3 updated.

  48. Schedule 3 Projects Register - Updated

  49. Schedule 3 updated.

  50. Schedule 3 Projects Register - file attachment updated

  51. Schedule 3 Projects Register updated.

  52. Schedule 3 Projects Register - Updated

  53. Schedule 3 Projects Register updated

  54. Schedule 3 Projects Register Updated

  55. Schedule 3 Projects Register - updated

  56. Schedule 3 Projects Register updated

  57. Schedule 3 Projects Register uploaded

  58. Schedule 3 Projects Register Update

  59. Schedule 3 updated

  60. Schedule 3 Projects Register updated.

  61. Schedule 3 Projects Register Updated

  62. Schedule 3 Projects Register updated.

  63. Schedule 3 Projects Register - Updated

  64. Schedule 3 Projects Register

  65. Schedule 3 spreadsheet updated.

  66. Schedule 3 Projects register updated.

  67. Schedule 3 project register - updated

  68. Schedule 3 register updated

  69. Schedule 3 Projects Register - Updated

  70. Schedule 3 Projects Register updated

  71. Updated Schedule 3 Projects Register.

  72. Schedule 3 spreadsheet updated.

  73. Schedule 3 Projects Register - Uploaded

  74. Schedule 3 Projects Register updated

  75. Schedule 3 Projects Register updated

  76. Schedule 3 Project Register uploaded.

  77. Schedule 3 Spreadsheet updated.

  78. Schedule 3 Projects Register updated

  79. Schedule 3 Projects Register - Uploaded

  80. Schedule 3 Projects Register - uploaded

  81. Schedule 3 Projects Register updated

  82. Schedule 3 Spreadsheet updated.

  83. Schedule 3 Projects Register- uploaded

  84. 2025 Production Screening Directions and 2025 Pipeline Screening Directions added

  85. Schedule 3 Projects Register - uploaded

  86. Schedule 3 Projects Register updated.

  87. Schedule 3 Projects Register updated

  88. Schedule 3 register updated

  89. Uploaded Schedule 3 Projects Register w.c. 03.02.2025

  90. Schedule 3 Register updated.

  91. Schedule 3 Projects Register updated

  92. Deep Drilling Screening Directions 2025 Environmental Impact Assessments (EIA) 2025

  93. Schedule 3 Projects Register - updated

  94. Schedule 3 Projects Register updated

  95. Updated SNS Activity Tracker W/C 16/12/2024.

  96. Schedule 3 Projects Register - uploaded

  97. Schedule 3 Projects Register updated.

  98. Schedule 3 Projects Register - Uploaded

  99. Schedule 3 Projects Register- Uploaded

  100. Schedule 3 Projects Register- uploaded

  101. Schedule 3 Projects Register - file attachment updated

  102. Schedule 3 Projects Register updated

  103. Update Schedule 3

  104. Schedule 3 Spreadsheet updated.

  105. Schedule 3 Projects Register updated.

  106. Schedule 3 Projects Register updated

  107. Schedule 3 Projects Register updated

  108. Schedule 3 Projects Register updated

  109. Schedule 3 Projects register updated.

  110. Schedule 3 Projects Register updated

  111. Schedule 3 Projects Register updated

  112. Schedule 3 Tracker Update

  113. Schedule 3 Projects Register updated

  114. Schedule 3 Projects Register updated

  115. Schedule 3 Projects Register updated to most recent version

  116. Schedule 3 Projects Register updated

  117. Schedule 3 Projects Register updated

  118. Schedule 3 Projects Register updated

  119. Update Schedule 3 - 24.06.24

  120. Schedule 3 project register updated.

  121. Schedule 3 Projects Register Updated to most recent version

  122. Schedule 3 Projects Register updated

  123. Schedule 3 register updated

  124. Schedule 3 Projects Register updated

  125. Schedule 3 Projects Register updated

  126. Schedule 3 Projects Register updated to most recent version

  127. schedule 3 spreadsheet updated

  128. New link to 2024 Production Screening Directions added

  129. Schedule 3 update

  130. Schedule 3 Projects Register updated to most recent version

  131. Schedule 3 projects register updated.

  132. Update of Schedule 3 document

  133. schedule 3 project register updated to most recent version

  134. Schedule 3 Projects Register updated

  135. Schedule 3 Projects Register updated

  136. Schedule 3 Projects Register updated

  137. Schedule 3 Project Register updated

  138. Addition of link to 2024 PL screening directions

  139. Schedule 3 Projects Register updated

  140. Schedule 3 Projects Register updated to most recent version

  141. Schedule 3 - 29/01/2024

  142. 2024 page added

  143. Schedule 3 register updated

  144. Schedule 3 updated

  145. Link to Deep Drilling Screening Directions - 2024 added

  146. Schedule 3 spreadsheet updated

  147. Schedule 3 register updated

  148. Schedule 3 Projects register updated to most recent version

  149. Schedule 3 - Updated

  150. Schedule 3 updated

  151. Schedule 3 Projects Register updated

  152. Updated Schedule 3 Projects Register Spreadsheet

  153. Schedule 3 Projects Register updated to most recent version

  154. Schedule 3 projects register updated

  155. Update Schedule 3

  156. Schedule 3 Projects Register updated

  157. Schedule 3 Spreadsheet updated

  158. Schedule 3 Projects Register updated to most recent version

  159. Link added to EIA Submissions and Decisions - 2023 webpage

  160. Schedule 3 Projects Register updated to most recent version

  161. Schedule 3 Projects Register updated to most recent version

  162. Schedule 3 project register - updated

  163. Schedule 3 Projects register updated

  164. Schedule 3 Projects Register - file attachment UPDATED

  165. Schedule 3 Projects Register weekly update

  166. Schedule 3 Projects Register updated to most recent version

  167. Schedule 3 Projects register - weekly update

  168. Schedule 3 updated

  169. Schedule 3 spreadsheet updated

  170. Schedule 3 Projects register updated to most recent version

  171. Updated Schedule 3 Projects Register - 03/07/2023

  172. Schedule 3 Projects Register w.c. 26.06.2023 - updated

  173. Schedule 3 spreadsheet updated

  174. Schedule 3 Projects Register updated to most recent version

  175. Schedule 3 Project Register updated to most recent version

  176. Schedule 3 Projects Register - 29.05.2023 - UPDATE

  177. Current Schedule 3 Spreadsheet

  178. Schedule 3 Projects Register updated to most recent version

  179. Updated Schedule 3

  180. Schedule 3 Project Register updated to latest version

  181. add 2023 Pipeline Screening Directions link

  182. Schedule 3 projects register update

  183. Schedule 3 Projects Register updated

  184. Link added to Deep Drilling Screening Directions - 2023

  185. Schedule 3 Projects Register updated to most recent version

  186. Schedule 3 spreadsheet updated

  187. Schedule 3 Project Register updated.

  188. Most recent Schedule 3 projects register uploaded

  189. Schedule 3 register updated

  190. Updated Schedule 3 Projects Register added

  191. Updated Schedule 3 spreadsheet

  192. Schedule 3 Projects Register Updated

  193. Update to schedule 3 projects register

  194. Updated Schedule 3 Projects Register as at 22.08.2022

  195. Schedule 3 uploaded

  196. Schedule 3 Projects Register updated

  197. Schedule 3 register updated

  198. Schedule 3 Projects Register w.c. 18.07.2022 - Update

  199. Schedule 3 projects register updated

  200. Schedule 3 updated

  201. Schedule 3 updated

  202. Schedule 3 spreadsheet updated

  203. Schedule 3 register updated

  204. Schedule 3 updated

  205. Schedule 3 Projects Register updated to most recent version

  206. A link to 2022 Environmental Statements added.

  207. Schedule 3 updated

  208. Schedule 3 updated

  209. Schedule 3 register updated

  210. Schedule 3 replaced with the newest version

  211. Schedule 3 Register updated

  212. Schedule 3 Register updated

  213. Schedule 3 project register updated

  214. Update to Schedule 3 Projects Register

  215. Updated schedule 3 spreadsheet

  216. Addition of Pipeline Screening Directions - 2022

  217. Schedule 3 register updated

  218. Addition of link to Production Screening Direction 2022 page

  219. Weekly Schedule 3 Projects Register update

  220. Weekly Schedule 3 Projects Register Spreadsheet Update

  221. Weekly Update to Schedule 3 Projects Register

  222. Addition of Deep Drilling Screening Directions page for 2022

  223. Schedule 3 Project Tracker updated

  224. Schedule 3 tracking sheet updated.

  225. Schedule 3 tracking spreadsheet updated

  226. Schedule 3 register updated

  227. Schedule 3 tracker updated.

  228. Schedule 3 Projects Register updated.

  229. Weekly Schedule 3 Projects Register Spreadsheet

  230. Updated Schedule 3 register

  231. Schedule 3 tracking register updated.

  232. New schedule 3 register uploaded

  233. Schedule 3 Projects Register updated.

  234. Updated Schedule 3 register

  235. Updated Schedule 3 Projects Register,

  236. Schedule 3 Register updated

  237. updated schedule 3 register

  238. Weekly Schedule 3 Projects Register udpate

  239. Updated schedule 3 register

  240. Updated Schedule 3 Register

  241. Schedule 3 Projects Register weekly update

  242. Weekly Schedule 3 Projects Register update

  243. Schedule 3 projects register updated.

  244. Schedule 3 register updated

  245. Updated Schedule 3 Register

  246. Schedule 3 tracking spreadsheet updated.

  247. Updated Schedule 3 Register

  248. Schedule 3 tracker updated.

  249. Schedule 3 tracker updated.

  250. Schedule 3 register updated.

  251. Weekly 'Schedule 3 Projects Register' update

  252. Schedule 3 Register updated

  253. Schedule 3 tracking sheet updated.

  254. Schedule 3 Projects Register updated.

  255. Weekly Update to Schedule 3 Projects Register Spreadsheet

  256. Schedule 3 tracking updated.

  257. Schedule 3 tracking spreadsheet updated.

  258. Schedule 3 tracking spreadsheet updated.

  259. Update to Schedule 3 Projects Register

  260. Schedule 3 Projects Register updated.

  261. Addition of section for 'Environmental Impact Asssements (EIA) - Transitional Cases' within the 'Environmental Impact Assesssments (EIA)' section

  262. Weekly update to the Schedule 3 Projects spreadsheet

  263. Update of - Sched 3 spreadsheets - 25/01/2021

  264. 'Schedule 3 Projects Register' spreadsheet weekly update

  265. First published.

Sign up for emails or print this page

Update history

2026-09-28 15:41
Schedule 3 Projects Register updated

2026-09-21 13:56
Schedule 3 updated

2026-09-14 13:47
Schedule 3 Projects Register updated

2026-09-07 09:59
Schedule 3 Projects Register Updated

2026-09-01 08:26
updated Schedule 3 Spreadsheet

2026-08-24 12:04
Schedule 3 Projects Register Updated

2026-08-17 14:45
Schedule 3 Projects Register updated

2026-08-10 09:48
updated – Schedule3ProjectsRegister-_10.08.2026

2026-07-28 08:36
Schedule 3 Projects Register

2026-07-20 14:23
Schedule 3 Projects Register updated

2026-07-13 12:40
Schedule 3 Projects Register updated

2026-07-06 13:04
Schedule 3 Projects Register updated

2026-06-29 14:05
Schedule 3 Projects Register updated

2026-06-22 10:33
Schedule 3 Projects Register – updated

2026-06-15 13:45
Schedule 3 Projects Register updated

2026-06-08 15:11
Updated schedule 3

2026-06-01 15:09
Schedule 3 Projects Register updated.

2026-05-25 16:06
Schedule 3 Projects Register updated

2026-05-18 15:44
Schedule 3 Projects Register updated

2026-05-11 16:09
Schedule 3 Projects Register Updated

2026-05-05 14:52
Schedule 3 – uploaded

2026-04-28 10:47
Schedule 3 document updated

2026-04-21 13:15
Schedule 3 Projects – updated

2026-04-13 14:33
Schedule 3 Projects Register updated

2026-04-07 10:06
Schedule 3 Projects Register Updated

2026-03-30 13:29
Schedule 3 Projects Register updated

2026-03-23 10:01
Schedule 3 Project Register Updated

2026-03-17 11:07
Schedule 3 Projects Register updated

2026-03-09 15:11
Schedule 3 Projects Register – updated

2026-03-04 11:53
Production Screening Directions – 2026

2026-03-02 11:24
Schedule 3 Projects Register updated.

2026-02-23 14:46
Updated Schedule 3 Project Register

2026-02-16 10:16
Schedule 3 Projects Register updated

2026-02-09 14:38
Schedule 3 Projects Register – updated

2026-02-02 12:19
Schedule 3 Projects Register updated.

2026-01-30 08:17
Addition of 2026 page to Pipeline Screening Directions

2026-01-19 11:54
Schedule 3 Projects Register updated

2026-01-12 10:50
Schedule 3 Projects Register updated

2026-01-05 14:28
Schedule 3 Projects Register Updated

2025-12-30 15:29
Addition of 2026

2025-12-29 11:11
Schedule 3 Projects Register updated

2025-12-15 08:57
Schedule 3 Projects Register updated

2025-12-08 16:14
Schedule 3 Projects Register – updated

2025-12-01 15:06
Schedule 3 Projects Register updated.

2025-11-24 15:58
Schedule 3 Projects Register updated.

2025-11-18 09:53
Schedule 3 updated.

2025-11-10 15:21
Schedule 3 Projects Register – Updated

2025-11-03 13:49
Schedule 3 updated.

2025-10-27 12:47
Schedule 3 Projects Register – file attachment updated

2025-10-20 11:47
Schedule 3 Projects Register updated.

2025-10-13 15:22
Schedule 3 Projects Register – Updated

2025-10-07 15:51
Schedule 3 Projects Register updated

2025-09-29 10:46
Schedule 3 Projects Register Updated

2025-09-22 12:03
Schedule 3 Projects Register – updated

2025-09-15 11:16
Schedule 3 Projects Register updated

2025-09-08 13:59
Schedule 3 Projects Register uploaded

2025-09-01 10:43
Schedule 3 Projects Register Update

2025-08-26 11:56
Schedule 3 updated

2025-08-18 13:45
Schedule 3 Projects Register updated.

2025-08-11 09:11
Schedule 3 Projects Register Updated

2025-08-04 10:46
Schedule 3 Projects Register updated.

2025-07-28 15:50
Schedule 3 Projects Register – Updated

2025-07-21 12:13
Schedule 3 Projects Register

2025-07-14 11:28
Schedule 3 spreadsheet updated.

2025-07-09 09:53
Schedule 3 Projects register updated.

2025-06-30 14:14
Schedule 3 project register – updated

2025-06-24 11:22
Schedule 3 register updated

2025-06-16 15:44
Schedule 3 Projects Register – Updated

2025-06-09 13:59
Schedule 3 Projects Register updated

2025-06-02 14:38
Updated Schedule 3 Projects Register.

2025-05-26 15:53
Schedule 3 spreadsheet updated.

2025-05-19 13:55
Schedule 3 Projects Register – Uploaded

2025-05-13 10:24
Schedule 3 Projects Register updated

2025-05-06 08:52
Schedule 3 Projects Register updated

2025-04-28 10:16
Schedule 3 Project Register uploaded.

2025-04-22 13:29
Schedule 3 Spreadsheet updated.

2025-04-14 16:13
Schedule 3 Projects Register updated

2025-04-07 15:21
Schedule 3 Projects Register – Uploaded

2025-04-01 07:49
Schedule 3 Projects Register – uploaded

2025-03-24 16:44
Schedule 3 Projects Register updated

2025-03-17 13:03
Schedule 3 Spreadsheet updated.

2025-03-10 12:57
Schedule 3 Projects Register- uploaded

2025-03-03 15:48
2025 Production Screening Directions and 2025 Pipeline Screening Directions added

2025-03-03 14:27
Schedule 3 Projects Register – uploaded

2025-02-24 13:43
Schedule 3 Projects Register updated.

2025-02-17 13:41
Schedule 3 Projects Register updated

2025-02-11 13:58
Schedule 3 register updated

2025-02-03 11:09
Uploaded Schedule 3 Projects Register w.c. 03.02.2025

2025-01-27 15:08
Schedule 3 Register updated.

2025-01-20 15:19
Schedule 3 Projects Register updated

2025-01-13 13:57
Deep Drilling Screening Directions 2025Environmental Impact Assessments (EIA) 2025

2025-01-13 13:37
Schedule 3 Projects Register – updated

2025-01-06 09:25
Schedule 3 Projects Register updated

2024-12-16 10:52
Updated SNS Activity Tracker W/C 16/12/2024.

2024-12-09 14:01
Schedule 3 Projects Register – uploaded

2024-12-03 12:47
Schedule 3 Projects Register updated.

2024-11-25 14:10
Schedule 3 Projects Register – Uploaded

2024-11-18 14:27
Schedule 3 Projects Register- Uploaded

2024-11-11 12:09
Schedule 3 Projects Register- uploaded

2024-11-05 10:54
Schedule 3 Projects Register – file attachment updated

2024-10-29 09:33
Schedule 3 Projects Register updated

2024-10-23 10:50
Update Schedule 3

2024-10-18 12:54
Schedule 3 Spreadsheet updated.

2024-10-07 11:51
Schedule 3 Projects Register updated.

2024-09-30 15:08
Schedule 3 Projects Register updated

2024-09-23 09:54
Schedule 3 Projects Register updated

2024-09-17 10:29
Schedule 3 Projects Register updated

2024-09-10 13:31
Schedule 3 Projects register updated.

2024-09-02 13:25
Schedule 3 Projects Register updated

2024-08-28 10:15
Schedule 3 Projects Register updated

2024-08-19 14:54
Schedule 3 Tracker Update

2024-08-12 15:10
Schedule 3 Projects Register updated

2024-07-29 10:05
Schedule 3 Projects Register updated

2024-07-23 08:56
Schedule 3 Projects Register updated to most recent version

2024-07-15 11:12
Schedule 3 Projects Register updated

2024-07-08 11:27
Schedule 3 Projects Register updated

2024-07-01 10:41
Schedule 3 Projects Register updated

2024-06-24 10:50
Update Schedule 3 – 24.06.24

2024-06-20 10:19
Schedule 3 project register updated.

2024-06-10 16:17
Schedule 3 Projects Register Updated to most recent version

2024-06-03 09:35
Schedule 3 Projects Register updated

2024-05-27 11:27
Schedule 3 register updated

2024-05-20 11:52
Schedule 3 Projects Register updated

2024-05-14 13:21
Schedule 3 Projects Register updated

2024-04-30 14:22
Schedule 3 Projects Register updated to most recent version

2024-04-22 16:04
schedule 3 spreadsheet updated

2024-04-18 14:37
New link to 2024 Production Screening Directions added

2024-04-16 13:29
Schedule 3 update

2024-04-09 15:22
Schedule 3 Projects Register updated to most recent version

2024-04-02 13:33
Schedule 3 projects register updated.

2024-03-26 14:16
Update of Schedule 3 document

2024-03-21 10:11
schedule 3 project register updated to most recent version

2024-03-12 15:18
Schedule 3 Projects Register updated

2024-03-04 15:39
Schedule 3 Projects Register updated

2024-02-27 08:21
Schedule 3 Projects Register updated

2024-02-20 11:21
Schedule 3 Project Register updated

2024-02-14 15:35
Addition of link to 2024 PL screening directions

2024-02-12 15:50
Schedule 3 Projects Register updated

2024-02-07 09:20
Schedule 3 Projects Register updated to most recent version

2024-01-30 08:41
Schedule 3 – 29/01/2024

2024-01-22 13:54
2024 page added

2024-01-22 11:00
Schedule 3 register updated

2024-01-15 14:08
Schedule 3 updated

2024-01-12 13:35
Link to Deep Drilling Screening Directions – 2024 added

2024-01-09 09:37
Schedule 3 spreadsheet updated

2024-01-03 14:17
Schedule 3 register updated

2023-12-18 11:47
Schedule 3 Projects register updated to most recent version

2023-12-11 16:19
Schedule 3 – Updated

2023-12-04 14:17
Schedule 3 updated

2023-11-27 14:49
Schedule 3 Projects Register updated

2023-11-23 16:14
Updated Schedule 3 Projects Register Spreadsheet

2023-11-13 13:37
Schedule 3 Projects Register updated to most recent version

2023-11-06 14:49
Schedule 3 projects register updated

2023-10-30 16:35
Update Schedule 3

2023-10-24 15:38
Schedule 3 Projects Register updated

2023-10-17 11:37
Schedule 3 Spreadsheet updated

2023-10-13 10:59
Schedule 3 Projects Register updated to most recent version

2023-10-05 15:06
Link added to EIA Submissions and Decisions – 2023 webpage

2023-10-03 15:16
Schedule 3 Projects Register updated to most recent version

2023-09-05 13:18
Schedule 3 Projects Register – file attachment UPDATED

2023-08-29 16:55
Schedule 3 Projects Register weekly update

2023-08-15 16:05
Schedule 3 Projects Register updated to most recent version

2023-08-09 14:59
Schedule 3 Projects register – weekly update

2023-08-02 14:07
Schedule 3 updated

2023-07-17 11:32
Schedule 3 spreadsheet updated

2023-07-10 16:21
Schedule 3 Projects register updated to most recent version

2023-07-06 13:13
Updated Schedule 3 Projects Register – 03/07/2023

2023-06-28 10:36
Schedule 3 Projects Register w.c. 26.06.2023 – updated

2023-06-20 09:01
Schedule 3 spreadsheet updated

2023-06-14 09:43
Schedule 3 Projects Register updated to most recent version

2023-06-05 14:53
Schedule 3 Project Register updated to most recent version

2023-05-30 10:05
Schedule 3 Projects Register – 29.05.2023 – UPDATE

2023-05-16 10:12
Current Schedule 3 Spreadsheet

2023-04-24 13:57
Schedule 3 Projects Register updated to most recent version

2023-04-05 16:06
Updated Schedule 3

2023-02-21 16:45
Schedule 3 Project Register updated to latest version

2023-02-10 15:34
add 2023 Pipeline Screening Directions link

2023-02-08 14:28
Schedule 3 projects register update

2023-01-25 14:38
Schedule 3 Projects Register updated

2023-01-05 15:36
Link added to Deep Drilling Screening Directions – 2023

2022-12-20 10:26
Schedule 3 Projects Register updated to most recent version

2022-12-13 11:57
Schedule 3 spreadsheet updated

2022-11-28 10:44
Schedule 3 Project Register updated.

2022-11-15 13:39
Most recent Schedule 3 projects register uploaded

2022-10-12 08:45
Schedule 3 register updated

2022-10-04 12:14
Updated Schedule 3 Projects Register added

2022-09-27 10:20
Updated Schedule 3 spreadsheet

2022-09-20 13:43
Schedule 3 Projects Register Updated

2022-08-30 11:21
Update to schedule 3 projects register

2022-08-23 14:01
Updated Schedule 3 Projects Register as at 22.08.2022

2022-08-15 14:00
Schedule 3 uploaded

2022-08-09 09:37
Schedule 3 Projects Register updated

2022-07-27 09:27
Schedule 3 register updated

2022-07-20 12:46
Schedule 3 Projects Register w.c. 18.07.2022 – Update

2022-07-11 13:08
Schedule 3 projects register updated

2022-06-28 09:30
Schedule 3 updated

2022-06-23 13:14
Schedule 3 updated

2022-06-14 15:30
Schedule 3 spreadsheet updated

2022-05-23 13:26
Schedule 3 register updated

2022-05-17 14:51
Schedule 3 updated

2022-05-03 14:08
Schedule 3 Projects Register updated to most recent version

2022-04-28 16:34
A link to 2022 Environmental Statements added.

2022-04-26 15:50
Schedule 3 updated

2022-04-19 12:43
Schedule 3 updated

2022-04-05 12:38
Schedule 3 register updated

2022-03-29 15:16
Schedule 3 replaced with the newest version

2022-03-21 14:44
Schedule 3 Register updated

2022-03-14 15:44
Schedule 3 Register updated

2022-03-08 15:29
Schedule 3 project register updated

2022-02-28 15:07
Update to Schedule 3 Projects Register

2022-02-23 14:32
Updated schedule 3 spreadsheet